12.07.2015 Views

Data Collection Report - Flood Control District of Maricopa County

Data Collection Report - Flood Control District of Maricopa County

Data Collection Report - Flood Control District of Maricopa County

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

VII. REPORT BIBLIOGRAPHY & REFERENCESAmerican Engineering Company, Final Drainage <strong>Report</strong> for Fieldcrest,Revised January 2000.American Engineering Company, Final Drainage <strong>Report</strong> for SundanceRanch, August 1998, Revised November 1998.American Engineering Company, Master Grading and Drainage Planfor Cambridge Estates, July 1999, Revised October 1999.ASL Consulting Engineers, Final Drainage <strong>Report</strong>, Cowden Property<strong>Flood</strong>plain Reduction for Lots 6 & 16, Revised February 18,1999.Dibble & Associates Consulting Engineers, Initial Hydraulic <strong>Report</strong>,Project No. I-10-2 (89) PE, Highway: I-10 Ehrenberg-Phoenix,Section: 39 th Ave - 27th Ave, January, 1983.Dibble & Associates Consulting Engineers, Addendum to Hydraulic<strong>Report</strong>, Project No. I-10-2 (89) PE, Highway: I-10 Ehrenberg-Phoenix, Section: 39 th Ave - 27th Ave, January, 1985.Dibble & Associates Consulting Engineers, Drainage Concept <strong>Report</strong>,115 th Avenue - Gila River Bridge to MC 85 (WO #80518),March 24, 1998.Dibble & Associates Consulting Engineers, Drainage <strong>Report</strong>,Willamette Industries Box Plant, December 13, 1999.<strong>Flood</strong> <strong>Control</strong> <strong>District</strong> <strong>of</strong> <strong>Maricopa</strong> <strong>County</strong>, Drainage Design MenuSystem, Version 1.1, August 1995.HDR Engineering Inc., Southwest Loop Highway (S.R. 218) DrainageDesign Concept <strong>Report</strong> , September, 1988.Howard Needles Tammen & Bergend<strong>of</strong>f, Interstate 10 Freeway West,Offsite Storm Run<strong>of</strong>f and Interceptor Analysis, April, 1983.Keith W. Hubbard Pr<strong>of</strong>essional Engineers, Drainage Study and <strong>Report</strong>for Freightliner Arizona Ltd., December, 1998.Landmark Engineering, Inc., Final Drainage <strong>Report</strong> For Marbella, May21, 1999.AZTEC Engineering, Preliminary Drainage <strong>Report</strong> - 115 th Ave, MC85to McDowell Road, December, 1999.Clouse Engineering, Inc., Master Drainage <strong>Report</strong> for The Sanctuary atAvondale, March 14, 2000.Coe & Van Loo Consultants, Inc., AGUA FRIA RIVER <strong>Flood</strong>plainDelineation Restudy (Project FCD 95-05), October 31, 1996.Coe & Van Loo Consultants, Inc., Master Drainage <strong>Report</strong> for CountryPlace - Phoenix, Arizona, Revised September 28, 1999.Dibble & Associates Consulting Engineers, <strong>Flood</strong>plain Delineation <strong>of</strong>the Tolleson Area Hydrology <strong>Report</strong> (Project FCD 95-26), May14, 1999.Dibble & Associates Consulting Engineers, <strong>Flood</strong>plain Delineation <strong>of</strong>the Tolleson Area, Final <strong>Report</strong> and Technical <strong>Data</strong> Notebook,(Project FCD 95-26) May, 1999.Federal Emergency Management Agency, <strong>Flood</strong> Insurance Study,<strong>Maricopa</strong> <strong>County</strong>, Arizona And Incorporated Areas, Volume 1<strong>of</strong> 12. Revised September 30, 1995.<strong>Maricopa</strong> <strong>County</strong>, Estrella - Land Use Plan, January 31, 1992.<strong>Maricopa</strong> <strong>County</strong>, <strong>Maricopa</strong> <strong>County</strong> 2020, Eye To The Future(Comprehensive Plan), October 20, 1997.<strong>Maricopa</strong> <strong>County</strong> Department <strong>of</strong> Transportation, MCDOTAccomplishments & Five-year Capital Improvements Programfor Fiscal Years 2000-2004.Michael Baker Jr, Inc., SALT-GILA RIVER <strong>Flood</strong>plain DelineationRestudy (Project FCD 92-01), May, 1999.Coe & Van Loo Consultants, Inc., Drainage <strong>Report</strong> for 91 st Avenue andLower Buckeye Road, August 12, 1999, Revised October 25,1999.<strong>Flood</strong> <strong>Control</strong> <strong>District</strong> <strong>of</strong> <strong>Maricopa</strong> <strong>County</strong>, Drainage Design Manualfor <strong>Maricopa</strong> <strong>County</strong>, Arizona, Volume I, Hydrology, January 1,1995.City <strong>of</strong> Phoenix Planning Department, Estrella Village Plan, March1999.DIBBLE & ASSOCIATES 69 DURANGO ADMPDATA COLLECTION REPORT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!