12.07.2015 Views

For ECC applications, this IEE Checklist Report shall be submitted with

For ECC applications, this IEE Checklist Report shall be submitted with

For ECC applications, this IEE Checklist Report shall be submitted with

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/Implementation and frequencySlope: flat (0-3%) gently sloping to rolling (3-18%) steep (>18%)Note: if project site is located inan erosion prone area greaterthat 18% slope submit:<strong>IEE</strong>REGGAREstablish MMT. EMF and EGF(FOR FURTHER EVALUATIONAND CLARIFICATION) Provide erosion control and slopeprotection measures Designate a Spoils Storage Area, <strong>with</strong>topsoil set aside for later use and allowmaximum re-use of spoils Compliance to the standard criteria forsanitary landfill development DAO 49 and50. Construction during dry season Stabilization of embankment <strong>with</strong> grassesor other soil cover Others, specify____________ Regular inspection of slopeprotection measures inerosion-prone areas Regular inspection for neweroded areas near the site Others, specify___________Requirements under EGGARCost of M SlopeCost: Othe____Compliance <strong>with</strong> Easement requirements (3meters for urban, 20 meters for agriculture,etc.) and ROWnIs the project site located in an areaidentified byMGB/PAGASA/PHIVOLCS ashazard prone? Yes NoExisting soil type in the area: sandy clay sandy-loam Others, specify____________________ Compliance <strong>with</strong> the DENR AdministrativeOrder No. 2003-30 and DENRAdministrative Order No. 2000-28,Implementing Guidelines on EngineeringGeological and Geo-hazard Assessment(EGGA). Implementation of the Ecological SolidWaste Management Plan (ESWMP) Set-up temporary fence around theconstruction area Implement re-use and recycling of wastematerials Implement proper segregation, collectionand disposal of domestic wastes in Daily inspection ofwaste/recycling bins forsegregation Daily inspection for presenceof mixed garbage in thefacility Weekly inspection of wasteaccumulated Costconstcklist <strong>Report</strong> for Subdivisions and Housing Projects

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!