12.07.2015 Views

For ECC applications, this IEE Checklist Report shall be submitted with

For ECC applications, this IEE Checklist Report shall be submitted with

For ECC applications, this IEE Checklist Report shall be submitted with

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Office Address:Contact Person:Designation:Contact Num<strong>be</strong>r/sLandline :Fax Num<strong>be</strong>r:Mobile :E-mail Address:_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________I. PROJECT DESCRIPTION1.1 PROJECT LOCATION AND AREA: Street Name, Barangay, and Municipality/City, Province_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Attach vicinity map/s and photographs of the project site and site development/layout plan and survey planapproved by Geodetic Engineer.Geographic coordinates of the project area (Preferably use WGS 84 datum, otherwise specify datum used).Perimeter/Boundary pointsLongitudeLatitude(based on OCT/TCT/etc)2 <strong>IEE</strong> <strong>Checklist</strong> <strong>Report</strong> for Subdivisions and Housing Projects

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!