- Page 2 and 3:
• • W 0 5906-02 • Delivery Or
- Page 4 and 5:
• • • • • • • • •
- Page 6 and 7:
• • • • 5906-01/02AIBURSHTY
- Page 8 and 9:
• • • • • • • • 590
- Page 10 and 11:
• • • furnace is dIvided into
- Page 12 and 13:
• • The station has had sIgnifi
- Page 14 and 15:
Flue gas samples were also taken at
- Page 16 and 17:
4.2.2 Power Plant AudIts The audIt
- Page 18 and 19:
Ifonly a modest savings of about 0.
- Page 20 and 21:
ECO-06 MAZUT SONIC FLOW METERS The
- Page 22 and 23:
DESCRIPTION COST 2. SIlica Analyzer
- Page 24 and 25:
6.0 IMPLEMENTATION PHASE (Follow-up
- Page 26 and 27:
earings, contacts, etc The electric
- Page 28 and 29:
• • • BURSHTYN COAL CONSUMPTI
- Page 34 and 35:
DelIvery Order #06 Task 2 Power Pla
- Page 36 and 37:
5906-011Cf2A/APPENDIX/4/18/95 APPEN
- Page 39 and 40: Simple Payback for O2 Analyzers - 1
- Page 41 and 42: 5906-01l02A/APPENDIX/4/t8/95 APPEND
- Page 45: Reference air tstrmg Zircoma substr
- Page 49: SPECIFICATIONS CD OXYGEN SENSING EQ
- Page 53: .- The 1261 Calorimeter Operates in
- Page 58 and 59: 14 The 1750 Proximate Analyzer A ra
- Page 68: 5906-01/C12A1APPLNDIX/4/18/95 APPEN
- Page 79 and 80: • • • • • BURSHTYN COAL Q
- Page 81: • • • • Polsky Coal Pure Pr
- Page 86: l,rJ., I BURSTHYN 1994 Jan Feb Mar
- Page 92 and 93: fGore. I, j3o'tE'tJeJ Kav .. 1. Vla
- Page 95 and 96: • ABBREVIATIONS AND UNIT CONVERSI
- Page 99 and 100: • • Deaerator vents Steam Traps
- Page 101: CHECKLIST Il\iPROVING COMBUSTION EF
- Page 104: • . j .- / DRAFT TRIP REPORT DELI
- Page 107 and 108: poor condition that 100 TIH are con
- Page 110 and 111: BURSHTYN ClIP PLANT DESIGN COAL ANA
- Page 115: • • • / • I I • I I I I I
- Page 123: .')- , - Deaerator vents Steam Trap
- Page 126 and 127: EXECUTIVE SUMMARY PRELIMINARY AUDIT
- Page 128 and 129: The above recommendations are preli
- Page 131 and 132: CONDENSER COOLING WATER Condenser c
- Page 133: AlTltCJtHENT 1 BURSHTYN ClIP PLANT
- Page 152:
• • • • • existing oxygen
- Page 160 and 161:
• which typically for all electro
- Page 162 and 163:
Vladimir Pachura - SeniorMaster. He
- Page 164 and 165:
• • • chromatograph They beli
- Page 166 and 167:
were starting a bOiler, 370°C, 40
- Page 168 and 169:
In Plant Cost to Produce Import Pow
- Page 170 and 171:
• • • A low life time resourc
- Page 172 and 173:
• • • • • • paid Decemb
- Page 174 and 175:
• • • • but recognition of
- Page 176 and 177:
• • • • • In January 1997
- Page 178 and 179:
• • • Protection valid for 19
- Page 180 and 181:
Month Consumption ODESSA CHP PLANT
- Page 182 and 183:
BURSHTYN COAL CONSUMPTION 1995 P 19
- Page 184 and 185:
• • 1996: Total Gas 123,336,000