4"12-Z 1 - part - usaid
4"12-Z 1 - part - usaid 4"12-Z 1 - part - usaid
t l Polsky Mixed % BURSHTYN C - 0.584 58.4 Kcal/Kg x Kg/2.2046 Lb x 3.9685 BTU/Kcal = 1.8 H 2 - 0.020 2.0 N 2 - 0.015 1.5 1.8 x Kcal/Kg = BTU/LB O 2 - 0.015 1.5 S - 0.018 1.8 W - 0.091 9.1 Ash - 0.257 25.7 1.000 100.0 W a - 11.5C + 34.5 (H2 + O 2/8) + 4.3 S - 11.5 (0.584) + 34.5 (0.02 + 0.015/8) + 4.3 (0.018) W a - 7.55 LBS AIRlLB FUEL W H20 - 9H + W + 0.014 W a - 9 (0.02) + 0.091 + 0.014 (7.55) WH20 - 0.377 LBS WATER/LB FUEL FORMED FROM COMBUSTION • HHV - LHV + 1040 X H20 BTU/LB • • • • D - (1.8 x 4974 KCal/Kg) BTU/LB + 1040 (0.377) HHV - 9345 BTU/LB IHA1LBERGITABLES
• • • • Polsky Coal Pure Proximate Fixed Carbon Volatiles Ash Water Primary 29.9 38.0 23.0 9.6 - 12 BURSHTYN Alternate Mine (31.0) (34.0) (27.0) (8.0) (0.6 '- 0.8 S) Combustibles As Received 1-(W+A)I100 = 0.679 C - 82.0 C - 55.670 H - 5.0 H - 3.395 N - 1.5 N - 1.019 0 - 10.3 0 - 6.994 S - 1.2 S - 0.815 W - 9.1 100 Ash = 23.0 99.993 Ash Fusion C t 1 = 960 12 = 1266 t 3 = 1400 Burshtyn Taganrog TP-l00 Boilers Rated 1270°C Problem with slagging on superheaters derated to 170 MW and increase excess air (LAMBDA) D IHAUBERGITABLES
- Page 34 and 35: DelIvery Order #06 Task 2 Power Pla
- Page 36 and 37: 5906-011Cf2A/APPENDIX/4/18/95 APPEN
- Page 39 and 40: Simple Payback for O2 Analyzers - 1
- Page 41 and 42: 5906-01l02A/APPENDIX/4/t8/95 APPEND
- Page 45: Reference air tstrmg Zircoma substr
- Page 49: SPECIFICATIONS CD OXYGEN SENSING EQ
- Page 53: .- The 1261 Calorimeter Operates in
- Page 58 and 59: 14 The 1750 Proximate Analyzer A ra
- Page 68: 5906-01/C12A1APPLNDIX/4/18/95 APPEN
- Page 79: • • • • • BURSHTYN COAL Q
- Page 86: l,rJ., I BURSTHYN 1994 Jan Feb Mar
- Page 91 and 92: 5906-01I02A1APPENDIX/41l8/95 APPEND
- Page 93: 5906-01/fJ2A/APPENDIXJ41l8/95 APPEN
- Page 96: 5906-01I02A/APPENDIX/411 8/95 APPEN
- Page 100 and 101: • • • BOIlPOCHHK flO YKYtDIIE
- Page 103 and 104: • • 5906-01 f02B/8f31197l8ursht
- Page 106 and 107: • • • • ) ) mass flow meter
- Page 108: ) Audit Equipment RECOMMENDATIONS B
- Page 111: • • t J • • • • ,-",I B
- Page 122 and 123: ') CHECKLIST IMPROVING COMBUSTION E
- Page 125 and 126: EXECUTIVE SUMMARY INTRODUCTION GENE
- Page 127 and 128: 9) Four (4) 02 analyzers rated for
- Page 129: INTRODUCTION ENERGO SYSTEM: LOCATIO
•<br />
•<br />
•<br />
•<br />
Polsky Coal Pure<br />
Proximate<br />
Fixed Carbon<br />
Volatiles<br />
Ash<br />
Water<br />
Primary<br />
29.9<br />
38.0<br />
23.0<br />
9.6 - <strong>12</strong><br />
BURSHTYN<br />
Alternate Mine<br />
(31.0)<br />
(34.0)<br />
(27.0)<br />
(8.0)<br />
(0.6 '- 0.8 S)<br />
Combustibles As Received 1-(W+A)I100 = 0.679<br />
C - 82.0 C - 55.670<br />
H - 5.0 H - 3.395<br />
N - 1.5 N - 1.019<br />
0 - 10.3 0 - 6.994<br />
S - 1.2 S - 0.815<br />
W - 9.1<br />
100 Ash = 23.0<br />
99.993<br />
Ash Fusion C<br />
t 1<br />
= 960<br />
<strong>12</strong> = <strong>12</strong>66<br />
t 3 = 1400 Burshtyn Taganrog TP-l00 Boilers Rated <strong>12</strong>70°C<br />
Problem with slagging on superheaters derated<br />
to 170 MW and increase excess air (LAMBDA)<br />
D IHAUBERGITABLES