1.3 Recommendations<br />

Boiler efficIency can be Improved, emisslOns reduced and the life expectancy of the Burshtyn<br />

power plant extended based on the recommendations lIsted m the following Table. The Table<br />

summanzes several energy conservation opportumtIes which WIll pay for themselves withm short<br />

periods of time.<br />

An investment of $155,000 in boiler efficiency improvements (ECO-04, 05, 06, 07, 08) will<br />

result in an annual savings of $392,500, which corresponds to 6,316 tonnes of coal,<br />

1,286,359 Nm 3 of natural gas and 336 tonnes of mazut. An additional investment of<br />

$25,000 in energy conservation programs (ECO-Ol, 02, 03) may result in an annual savings<br />

up to $1,150,000 which corresponds to 18,500 tonnes of coal, 3,769,311 Nm 3 of natural gas<br />

and 983 tonnes of mazut.<br />

Many other opportumties eXIst wIthin the power plant for energy savmgs WhICh could be the<br />

subject of further audits and actions by the plant staff. The energy conservation opportumties<br />

also have applications in other power plants.<br />

ECG# Descnption<br />

Summary of Ener2Y Conservation Opportunities (ECOs)<br />

Annual Project<br />

SImple Payback<br />

Savings<br />

in US$<br />

(1995 Pnces)<br />

Cost<br />

in US$<br />

(1995 Prices)<br />

Current<br />

Energy<br />

Prices<br />

01* Energy Conservation $958,000 $25,000 < I year<br />

Management Program Note I<br />

02* Energy Conservation $192,000 Note I < I year<br />

Traimng Program<br />

03* Fuel Quality Improvement See ECO-05 Note I < I year<br />

Program<br />

04* In-Situ Oxygen Analyzer $73,500 $29,000 4.8 Mo.<br />

One Boiler - 2 Probes<br />

05* Laboratory Calorimeter with $160,000 $35,000 2.6 Mo.<br />

Proximate Analyzer, Sulfur<br />

Analyzer and accessones<br />

06 Mazut Sonic Flow Meters (4 Included WIth $16,000 Included WIth<br />

Req'd) ECO-04 ECO-04<br />

07 On-Lme gas calorimeter $159,000 $35,000 2.6 Mo.<br />

08 Coal Flow Meters Included with $40,000 Included WIth<br />

ECO-04 ECO-04<br />

NOTE 1: See SectlOn 5<br />

5906-01/02A1BURSHTYN/5117/95<br />

(*) Highly Recommended<br />