• • • • • • • • • TABLE OF CONTENTS (CONTINUED) 4 1 5 BOIler Controls 4 1 6 BOiler Back End Including Stack 4 2 General Audit Activities 4 2 1 Scope and Methodology 4.2 2 Power Plant Audits 50 FINDINGS AND RECOMMENDATIONS 5 1 Low-Cost, No-Cost Short Term Opportunities 5.2 Medium and Long-Term Opportunities 5 3 Replicating and Expanding the Program to Other Power Plants 60 IMPLEMENTATION PHASE (Follow-up VISit) 6 1 Introduction 6 2 Results and Benefits 6 3 Conclusions 5906-01/02B/8/31/97/Burshtyn
Appendix A-1 Energy Conservation Opportunities (ECO's) • Appendix A-2 Vendor Information • Appendix 8 AudIt Records Appendix C • Power Plant Data • • • • • • Appendix 0 List of Contacts Made Durmg Plant Audits Appendix E Abbreviations and Units Conversions Appendix F Letter of Receipt for Equipment Energy Audit Appendix G References 1 2 3 4 5906-01/02B/8/31/97/Burshtyn APPENDICES Plant Audit VISitS Tnp Report, October 1994 Prellmmary Audit Report, December 1994 Plant Audit VISitS Tnp Report, Team #2, March 1995 Follow-up Audit Tnp Report, July-August 1997
- Page 2 and 3: • • W 0 5906-02 • Delivery Or
- Page 6 and 7: • • • • 5906-01/02AIBURSHTY
- Page 8 and 9: • • • • • • • • 590
- Page 10 and 11: • • • furnace is dIvided into
- Page 12 and 13: • • The station has had sIgnifi
- Page 14 and 15: Flue gas samples were also taken at
- Page 16 and 17: 4.2.2 Power Plant AudIts The audIt
- Page 18 and 19: Ifonly a modest savings of about 0.
- Page 20 and 21: ECO-06 MAZUT SONIC FLOW METERS The
- Page 22 and 23: DESCRIPTION COST 2. SIlica Analyzer
- Page 24 and 25: 6.0 IMPLEMENTATION PHASE (Follow-up
- Page 26 and 27: earings, contacts, etc The electric
- Page 28 and 29: • • • BURSHTYN COAL CONSUMPTI
- Page 34 and 35: DelIvery Order #06 Task 2 Power Pla
- Page 36 and 37: 5906-011Cf2A/APPENDIX/4/18/95 APPEN
- Page 39 and 40: Simple Payback for O2 Analyzers - 1
- Page 41 and 42: 5906-01l02A/APPENDIX/4/t8/95 APPEND
- Page 45: Reference air tstrmg Zircoma substr
- Page 49: SPECIFICATIONS CD OXYGEN SENSING EQ
- Page 53: .- The 1261 Calorimeter Operates in
•<br />
•<br />
•<br />
•<br />
•<br />
•<br />
•<br />
•<br />
•<br />
TABLE OF CONTENTS (CONTINUED)<br />
4 1 5 BOIler Controls<br />
4 1 6 BOiler Back End Including Stack<br />
4 2 General Audit Activities<br />
4 2 1 Scope and Methodology<br />
4.2 2 Power Plant Audits<br />
50 FINDINGS AND RECOMMENDATIONS<br />
5 1 Low-Cost, No-Cost Short Term Opportunities<br />
5.2 Medium and Long-Term Opportunities<br />
5 3 Replicating and Expanding the Program to Other Power Plants<br />
60 IMPLEMENTATION PHASE (Follow-up VISit)<br />
6 1 Introduction<br />
6 2 Results and Benefits<br />
6 3 Conclusions<br />