4"12-Z 1 - part - usaid

4"12-Z 1 - part - usaid 4"12-Z 1 - part - usaid

pdf.usaid.gov
from pdf.usaid.gov More from this publisher
29.11.2012 Views

• • • • • • • • • TABLE OF CONTENTS (CONTINUED) 4 1 5 BOIler Controls 4 1 6 BOiler Back End Including Stack 4 2 General Audit Activities 4 2 1 Scope and Methodology 4.2 2 Power Plant Audits 50 FINDINGS AND RECOMMENDATIONS 5 1 Low-Cost, No-Cost Short Term Opportunities 5.2 Medium and Long-Term Opportunities 5 3 Replicating and Expanding the Program to Other Power Plants 60 IMPLEMENTATION PHASE (Follow-up VISit) 6 1 Introduction 6 2 Results and Benefits 6 3 Conclusions 5906-01/02B/8/31/97/Burshtyn

Appendix A-1 Energy Conservation Opportunities (ECO's) • Appendix A-2 Vendor Information • Appendix 8 AudIt Records Appendix C • Power Plant Data • • • • • • Appendix 0 List of Contacts Made Durmg Plant Audits Appendix E Abbreviations and Units Conversions Appendix F Letter of Receipt for Equipment Energy Audit Appendix G References 1 2 3 4 5906-01/02B/8/31/97/Burshtyn APPENDICES Plant Audit VISitS Tnp Report, October 1994 Prellmmary Audit Report, December 1994 Plant Audit VISitS Tnp Report, Team #2, March 1995 Follow-up Audit Tnp Report, July-August 1997

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

TABLE OF CONTENTS (CONTINUED)<br />

4 1 5 BOIler Controls<br />

4 1 6 BOiler Back End Including Stack<br />

4 2 General Audit Activities<br />

4 2 1 Scope and Methodology<br />

4.2 2 Power Plant Audits<br />

50 FINDINGS AND RECOMMENDATIONS<br />

5 1 Low-Cost, No-Cost Short Term Opportunities<br />

5.2 Medium and Long-Term Opportunities<br />

5 3 Replicating and Expanding the Program to Other Power Plants<br />

60 IMPLEMENTATION PHASE (Follow-up VISit)<br />

6 1 Introduction<br />

6 2 Results and Benefits<br />

6 3 Conclusions<br />

5906-01/02B/8/31/97/Burshtyn

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!