to mstall the calonmeter now was the lack of finances to pay workers for<br />

adffitlonal, "non-regular" Job.<br />

Later I had another meetlng with Mr DeIman, Cluef engmeer, Mr. Stepas,<br />

Deputy cluefengineer, and Mr. Matlevsky. Matlevsky expressed the plan for<br />

oxygen analyzer installatlon and lus reasons to put on hold mstallatIon ofgas<br />

calorimeter The cluefengmeer and Ius deputy had ffifferent OpInIOn. They<br />

beheved that it IS very important to have an on-line gas calonmeter After long<br />

ffiscussIOn and argumg. the cluefengmeer decided to pass the gas calonmeter to<br />

the cheImcal de<strong>part</strong>ment and proImsed to mstall It.<br />

In the end we had more dISCUSSIOns with Mr.Bozenenkov. and the others. The<br />

followmg was decided:<br />

1) the oxygen analyzer Wlli be installed by the end of June. The plant would<br />

lIke to be the last m the line ofthe plants VISIted by ZIRTEK representative;<br />

2) the questIon of mstallatIon of calonmeter WllI be dIscussed once more at the<br />

plant and the final deCISIOn will be done withm next week.<br />

Together With the techmcal specialists we went to the warehouse , opened boxes<br />

with the equipment and checked the content. I proVIded the personnel With the<br />

new coupons for extra sensors for Enerac 2000 in exchange for the wrong ones<br />

they had received together with the eqUIpment.<br />

Back m the office I mstructed the operators on baSIC operatlons With the sonic<br />

flowmeter.<br />