DelIvery Order #06<br />

Task 2 Power Plants Combusllon EfficIency<br />

Busmess Trip Report.<br />

Penod: May 26 - 28. 1997<br />

Desllnallon: Burshtyn Thermal Power Plant<br />

Completed by: Alexander Filippov,<br />

Burns and Roe Kiev ResIdent Engineer<br />

May 30,1997<br />

Dunng the period from May 26 through May 28 I Vlslted Burshtyn Thermal<br />

Power Plant. The purposes ofthe tnp were:<br />

1) To sIgn letters of recelVlng for the equipment supplIed by USAID/Burns and<br />

Roe<br />

2) To schedule a start-up VlSlt of ZIRTEK and INSTROMET compames<br />

techrucal representatives.<br />

3) To teach the plant staffhow to operate the supplied energy eqUlpment.<br />

During the meellng with Mr. Bozenenkov. Deputy director on foreIgn relations he<br />

expressed rus sallsfaction by the fact of recelvmg the equipment. But he stressed<br />

that the plant was facIng serious dIfficulties related Wlth the majOr lack offunds<br />

The main reason IS non-payments for electncity. The plant doesn't get paId,<br />

although tills is one ofthe largest power plants in UkraIne and even sells<br />

electnclty abroad. The plant has bIg debt on wages for its workers. Since<br />

November 1996 the employees have been paId from 30 to 40% oftherr monthly<br />

wages.<br />

On Tuesday. May 27. we had a techmcal mee1lng and diSCUSSlOn of chfferent<br />

quesllons related to Installation of oxygen analyzer ZIRTEK. Meeting was<br />

headed by Mr. Mallevsky. Cruef of control eqUlpment de<strong>part</strong>ment, <strong>12</strong> specialISts<br />

<strong>part</strong>icIpated. By the time of my VlSlt the plan only had opened the boxes Wlth the<br />

eqUlpment and hadn't studIed the manuals yet. So the meellng turned to be a<br />

"bram storm" over different techrucal aspects of oxygen analyzer mstallation.<br />

The speCIaliSts determined the boiler and the points ofinstallallon. responsIble<br />

persons and general prelimmary steps ofwork. I explained neceSSIty to fimsh<br />

mstallallon by the end of June. 1997, in order for the ZIRTEK representallve to<br />

complete start-up ofthe analyzer. Mr. Mallevsky and other managers proIIl1sed<br />

to make their best to fimsh mstallahon in hme.<br />

We dIscussed the Issue of gas chromatograph installation Tills queshon was<br />

very difficult. It looked like the plant had dIfferent reasons not to mstall It at the<br />

hme bemg. FIrst. the system of payment for gas has changed smce the deCISIon<br />

of mstallatlon of gas chromatograph (calonmeter) was made. Now the plant pays<br />

for the volume of receIved gas and for Its "average. contract" calones Dunng last<br />

1.5 years they have not regIstered the calones content lower that contracted. only<br />

on the contrary. So they were reluctant to mstall the deVlce wruch can "make"<br />

them to pay addItional money for the gas. The second reason ofbemg reluctant