- Page 10 and 11: • • • furnace is dIvided into
- Page 12 and 13: • • The station has had sIgnifi
- Page 14 and 15: Flue gas samples were also taken at
- Page 16 and 17: 4.2.2 Power Plant AudIts The audIt
- Page 18 and 19: Ifonly a modest savings of about 0.
- Page 20 and 21: ECO-06 MAZUT SONIC FLOW METERS The
- Page 22 and 23: DESCRIPTION COST 2. SIlica Analyzer
- Page 24 and 25: 6.0 IMPLEMENTATION PHASE (Follow-up
- Page 26 and 27: earings, contacts, etc The electric
- Page 34 and 35: DelIvery Order #06 Task 2 Power Pla
- Page 36 and 37: 5906-011Cf2A/APPENDIX/4/18/95 APPEN
- Page 39 and 40: Simple Payback for O2 Analyzers - 1
- Page 41 and 42: 5906-01l02A/APPENDIX/4/t8/95 APPEND
- Page 45: Reference air tstrmg Zircoma substr
- Page 49: SPECIFICATIONS CD OXYGEN SENSING EQ
- Page 53: .- The 1261 Calorimeter Operates in
- Page 58 and 59: 14 The 1750 Proximate Analyzer A ra
- Page 68: 5906-01/C12A1APPLNDIX/4/18/95 APPEN
- Page 79 and 80:
• • • • • BURSHTYN COAL Q
- Page 81:
• • • • Polsky Coal Pure Pr
- Page 86:
l,rJ., I BURSTHYN 1994 Jan Feb Mar
- Page 91 and 92:
5906-01I02A1APPENDIX/41l8/95 APPEND
- Page 93:
5906-01/fJ2A/APPENDIXJ41l8/95 APPEN
- Page 96:
5906-01I02A/APPENDIX/411 8/95 APPEN
- Page 100 and 101:
• • • BOIlPOCHHK flO YKYtDIIE
- Page 103 and 104:
• • 5906-01 f02B/8f31197l8ursht
- Page 106 and 107:
• • • • ) ) mass flow meter
- Page 108:
) Audit Equipment RECOMMENDATIONS B
- Page 111:
• • t J • • • • ,-",I B
- Page 122 and 123:
') CHECKLIST IMPROVING COMBUSTION E
- Page 125 and 126:
EXECUTIVE SUMMARY INTRODUCTION GENE
- Page 127 and 128:
9) Four (4) 02 analyzers rated for
- Page 129:
INTRODUCTION ENERGO SYSTEM: LOCATIO
- Page 132 and 133:
PC boilers. They are also intereste
- Page 150:
1.1 IntroductIon TRIP REPORT USAID/
- Page 155:
• • • technology and requeste
- Page 161 and 162:
TRIP REPORT Delivery Order No 6 - E
- Page 163 and 164:
cooling water flow to condensers. N
- Page 165 and 166:
• • • Information system for
- Page 167 and 168:
• • • Instromet natural gas c
- Page 169 and 170:
• • 1 PTVM-100, Station 2 - adj
- Page 171 and 172:
availability of a pnnter, Its possi
- Page 173 and 174:
The Infrared thermometer was used u
- Page 175 and 176:
State Committee of the Autonomous C
- Page 177 and 178:
• • However, there are no recor
- Page 179 and 180:
Month Consumption ODESSA CHP PLANT
- Page 181 and 182:
Month Consumption ODESSA CHP PLANT
- Page 183 and 184:
BURsHTYN NATURAL GAS 1996 P 1997 P
- Page 185: