6.0 IMPLEMENTATION PHASE (Follow-up Visit)<br />

Burns and Roe engineers conducted follow-up VISitS and tralnrng dunng July 22 ­<br />

August 16 In Ukraine In accordance with the Delivery Order objectives The following<br />

report descnbes the actiVities of John E Hallberg, P E , who vIsited Burshtyn on Monday<br />

and Tuesday, August 4-5, 1997<br />

6.1 Introduction<br />

WORK PLAN<br />

For the power plant<br />

1 Review the steps taken by the plant for Implementation of recommendations and<br />

assist In completion<br />

2 Provide additional tralnrng and assistance on Installation and use of the equipment<br />

3 Refine and finalize the audit report and the recommendations for short and long<br />

term actions based on follow-up diSCUSSions with power plant personnel and minor<br />

additional audit work, If necessary<br />

4 Measure actual energy savings based on audit recommendations and equipment<br />

installation, If measurements are not pOSSible, estimate and provide the rationale<br />

of the method that IS used for estimation<br />

PERSONS MET DURING MEETINGS<br />

Vasyl' Bendasluk - Director (New)<br />

Igor I Bozenenkow - Deputy Director - Foreign Affairs (Former Director)<br />

Orest Danrluk - Deputy Director - Technrcal<br />

Nlkolay Kobzev - Deputy Chief Engineer for Reconstruction and Development<br />

Gorgory Stepas - Deputy Chief Engineer - Operations<br />

Ivan Berkosha - Chief of Technrcal De<strong>part</strong>ment<br />

TanaslY Semotyuk - Head of Adjustments Workshop<br />

Mykola Korvotsky - Head of Chemical Workshop - GC<br />

Peter Choplk - Senror Forman Automation Workshop - O 2 Analyzers<br />

Dept of Automatic Control Systems<br />

Mlchall Zelanovsky - Deputy Chief of Adjustment Dept - Enerac, Infrasec<br />

Yaroslav Pynhh - Computer Specialist<br />

Nina Kryzhanovskaya - Senror Foreman - Electncal De<strong>part</strong>ment<br />

INSTRUMENTS SUPPLIED TO BURSHTYN<br />

Zirtek oxygen analyzers, 2 probes for one T-boller, 1 two-channel analyzer<br />

Panametncs two channel ultraSOnic transit time flow meter<br />

Instromet natural gas chromatograph, display control Unit and accessones<br />

Oxygen cell and consumables for Enerac<br />

During February - March of 1995, the plant was proVided with an Enerac combustion<br />

analyzer, a laptop computer and pnnter, an Infrared thermometer and a Fluke power<br />

5906-01/02A18/31/97/Burshtyn