6.0 IMPLEMENTATION PHASE (Follow-up Visit)<br />
Burns and Roe engineers conducted follow-up VISitS and tralnrng dunng July 22 <br />
August 16 In Ukraine In accordance with the Delivery Order objectives The following<br />
report descnbes the actiVities of John E Hallberg, P E , who vIsited Burshtyn on Monday<br />
and Tuesday, August 4-5, 1997<br />
6.1 Introduction<br />
WORK PLAN<br />
For the power plant<br />
1 Review the steps taken by the plant for Implementation of recommendations and<br />
assist In completion<br />
2 Provide additional tralnrng and assistance on Installation and use of the equipment<br />
3 Refine and finalize the audit report and the recommendations for short and long<br />
term actions based on follow-up diSCUSSions with power plant personnel and minor<br />
additional audit work, If necessary<br />
4 Measure actual energy savings based on audit recommendations and equipment<br />
installation, If measurements are not pOSSible, estimate and provide the rationale<br />
of the method that IS used for estimation<br />
PERSONS MET DURING MEETINGS<br />
Vasyl' Bendasluk - Director (New)<br />
Igor I Bozenenkow - Deputy Director - Foreign Affairs (Former Director)<br />
Orest Danrluk - Deputy Director - Technrcal<br />
Nlkolay Kobzev - Deputy Chief Engineer for Reconstruction and Development<br />
Gorgory Stepas - Deputy Chief Engineer - Operations<br />
Ivan Berkosha - Chief of Technrcal De<strong>part</strong>ment<br />
TanaslY Semotyuk - Head of Adjustments Workshop<br />
Mykola Korvotsky - Head of Chemical Workshop - GC<br />
Peter Choplk - Senror Forman Automation Workshop - O 2 Analyzers<br />
Dept of Automatic Control Systems<br />
Mlchall Zelanovsky - Deputy Chief of Adjustment Dept - Enerac, Infrasec<br />
Yaroslav Pynhh - Computer Specialist<br />
Nina Kryzhanovskaya - Senror Foreman - Electncal De<strong>part</strong>ment<br />
INSTRUMENTS SUPPLIED TO BURSHTYN<br />
Zirtek oxygen analyzers, 2 probes for one T-boller, 1 two-channel analyzer<br />
Panametncs two channel ultraSOnic transit time flow meter<br />
Instromet natural gas chromatograph, display control Unit and accessones<br />
Oxygen cell and consumables for Enerac<br />
During February - March of 1995, the plant was proVided with an Enerac combustion<br />
analyzer, a laptop computer and pnnter, an Infrared thermometer and a Fluke power<br />
5906-01/02A18/31/97/Burshtyn