• • W 0 5906-02 • Delivery Order NO.6 Energy Efficiency and Reliability - Ukraine Task 2 - Power Plants Combustion Efficiency • • Final Audit Report Burshtyn Power Plant • August 1997 • • Prepared by: Prepared for John E. Hallberg, P.E. Alexander Filippov (Kiev) Burns and Roe Enterprises, Inc. 800 Kinderkamack Road Oradell, NJ U.S. Agency for International Development Washington, D.C. 20523-1415 • Bums and Roe Enterprises, Inc. 1400 K Street, NW. SUite 1050, Washington, 0 C 20005 Telephone (202) 408-6831 Facsimile' (202) 408-6835
COMBUSTION EFFICIENCY AUDIT REPORT UKRAINIAN POWER PLANTS BURSHTYN POWER PLANT TABLE OF CONTENTS Page 1.0 EXECUTIVE SUMMARY 1 1.1 Introduction 1 1.2 Principal Findmgs 1 1.3 Recommendations 2 2.0 BACKGROUND 3 2.1 Objectives of Energy Saving Program 3 2.2 Purpose of the AudIt 4 3.0 DESCRIPTION OF POWER PLANT 4 3.1 General Description 4 3.2 BOller Plant 4 3.3 Coal Handling 5 3.4 Mazut Supply 5 3.5 Gas Supply 5 3.6 Boiler Efficiency CalculatIons 5 3.7 Process Control System 5 3.8 Environmental Issues 6 3.9 Future Plans 6 3.10 Inspection, Assessment, Comments 6 4.0 DESCRIPTION OF AUDIT ACTIVITIES 7 4.1 Specific Audit ActiVItIes 7 4.1.1 Scope and Methodology 7 4.1.2 General 8 4.1.3 BOller Efficiency 8 41.4 130iler l?lant 9 5906-01lO2AlPreface 2/5/17/95
- Page 4 and 5: • • • • • • • • •
- Page 6 and 7: • • • • 5906-01/02AIBURSHTY
- Page 8 and 9: • • • • • • • • 590
- Page 10 and 11: • • • furnace is dIvided into
- Page 12 and 13: • • The station has had sIgnifi
- Page 14 and 15: Flue gas samples were also taken at
- Page 16 and 17: 4.2.2 Power Plant AudIts The audIt
- Page 18 and 19: Ifonly a modest savings of about 0.
- Page 20 and 21: ECO-06 MAZUT SONIC FLOW METERS The
- Page 22 and 23: DESCRIPTION COST 2. SIlica Analyzer
- Page 24 and 25: 6.0 IMPLEMENTATION PHASE (Follow-up
- Page 26 and 27: earings, contacts, etc The electric
- Page 28 and 29: • • • BURSHTYN COAL CONSUMPTI
- Page 34 and 35: DelIvery Order #06 Task 2 Power Pla
- Page 36 and 37: 5906-011Cf2A/APPENDIX/4/18/95 APPEN
- Page 39 and 40: Simple Payback for O2 Analyzers - 1
- Page 41 and 42: 5906-01l02A/APPENDIX/4/t8/95 APPEND
- Page 45: Reference air tstrmg Zircoma substr
- Page 49: SPECIFICATIONS CD OXYGEN SENSING EQ
•<br />
•<br />
W 0 5906-02<br />
• Delivery Order NO.6<br />
Energy Efficiency and Reliability - Ukraine<br />
Task 2 - Power Plants Combustion Efficiency<br />
•<br />
•<br />
Final Audit Report<br />
Burshtyn Power Plant<br />
• August 1997<br />
•<br />
•<br />
Prepared by:<br />
Prepared for<br />
John E. Hallberg, P.E.<br />
Alexander Filippov (Kiev)<br />
Burns and Roe Enterprises, Inc.<br />
800 Kinderkamack Road<br />
Oradell, NJ<br />
U.S. Agency for International Development<br />
Washington, D.C. 20523-1415<br />
• Bums and Roe Enterprises, Inc.<br />
1400 K Street, NW. SUite 1050, Washington, 0 C 20005<br />
Telephone (202) 408-6831 Facsimile' (202) 408-6835