In Plant Cost to Produce Import Power Annual Ave. Cost Winter - 3 Kp/KWh (1 65¢) 65 Kp/KWh (3 57¢) 65 Kp/KWh (3 57¢) 8 Summer - 20 Kp/KWh (10 9¢) 6 5 Kp/KWh (3 57¢) 65 Kp/KWh (3 57¢) 8 ODESSA - 31 July 1997 Avg. Sell In the result ofthe computatIon modes and elimInation ofthe insulation defects earned with application of Instruments Enerac + Cyclops, these were achieved economy offuel In terms of the condition of fuel. (7000 KCaIlKg) Consumption of Conventional Fuel Savings 1995 1996 1997 878 tons 724 tons 222 tons 04% 04% 02% For the penod of operation of the gas analyzer Enerac 2000 between March 1995 and December 1996, a bngade team of adjusters and engineers of the Central Research and TechnIcal Department of Odessa Energy Adjustment, there were fulfilled the works that are Similar for 9 out of 14 installed bOilers Odessa Heat Power Plant - Mode and ecological and heat and techmcal tests of the steam bOilers KU-1 1 TP-170, Station #5, 6, 7, and 8 adjustments of the furnace mode, ecological and heat and techmcal tests with optImIzation of the harmful substances In the coming out smoke output gases 2 TP-47, Station 10 adjustment of the furnace mode, ecologIcal and heat and chemical adjustment with optimization of exhaust of the harmful substances Into the atmosphere in the coming out smoke gases • At the bOIler of KU-2 • 1 GM-50, Station 1, 2, 3 adjustment of the furnace mode, ecologIcal, heat and technical adjustment with optImization of the exhausted harmful substances, At the bOilers of the water heating bOiler house of Odessa Heat Power Plant. 8
• • 1 PTVM-100, Station 2 - adjustment of the furnace mode, ecological, heat and technical adjustment with optimization of the exhausted harmful substances At the enterprises of Odessa Heat Supply Network' 1 There were carned out ecological, heat and technical tests of the water heating bOIlers at the following bOiler houses Severnaya-1 Northern Yuzhnaya-1 Southern Chuboska - BOilers PTVM-50, No 1 and 2 BOilers PTVM-1 00 I No 3 and 4 Boilers PTVM-50, No 1,2,3 and 4 BOIlers KBGM-50, No 3 and 5 Besides on the steam boilers of Odessa Steam Power Plant they regularly carned out work aimed at correcting the mode gUidelines after a long term non-operation of the equipment, In case of operating the bOilers, on a combined fuel (gas + mazut), determination of the operation charactenstlcs of the bOilers on the ground of the results of the gas analySIS (leakages along the gas path of bOIler) There were also carned out express tests of the bOilers before their repair and after repairing to evaluate the fulfilled repair works CONCLUSIONS DUring the period of operation of the Instrument Enerac 2000, the speCialists from the group for adjustment of the heat and technical eqUipment of Enterprise Adjustment one can come to the following conclUSions Operation of the Instrument for determination and adjustment of the optimal combustion mode for a set load gives reduction of the working time by 50-60% The effiCiency of carrying out of adjustment and regulation (controlling) of the furnace process as the bOiler IS rising on account of reduction of the time for making samples, and It Increases the capacity of the bOiler by 0 8 - 1 2% due to the preCISion of the Instrument readings Work With the Instrument Enerac 2000 IS of large effect In the work of the operations people of the bOilers concerning corrections of the furnace mode when working In the non-stationary modes of the bOiler work, as well as It gives a large reduction of time when fulfilling the mode and adjustment and also ecological and heat and technical tests of a bOiler With the aim of making the mode gUidehnes as well as the ecological and heat and technical charactenstlcs of the bOiler Remarks (or comments) (concerning the organization and service maintenance) 9
- Page 122 and 123: ') CHECKLIST IMPROVING COMBUSTION E
- Page 125 and 126: EXECUTIVE SUMMARY INTRODUCTION GENE
- Page 127 and 128: 9) Four (4) 02 analyzers rated for
- Page 129: INTRODUCTION ENERGO SYSTEM: LOCATIO
- Page 132 and 133: PC boilers. They are also intereste
- Page 150: 1.1 IntroductIon TRIP REPORT USAID/
- Page 155: • • • technology and requeste
- Page 161 and 162: TRIP REPORT Delivery Order No 6 - E
- Page 163 and 164: cooling water flow to condensers. N
- Page 165 and 166: • • • Information system for
- Page 167: • • • Instromet natural gas c
- Page 171 and 172: availability of a pnnter, Its possi
- Page 173 and 174: The Infrared thermometer was used u
- Page 175 and 176: State Committee of the Autonomous C
- Page 177 and 178: • • However, there are no recor
- Page 179 and 180: Month Consumption ODESSA CHP PLANT
- Page 181 and 182: Month Consumption ODESSA CHP PLANT
- Page 183 and 184: BURsHTYN NATURAL GAS 1996 P 1997 P
- Page 185: • • • • • • • Simfero
•<br />
•<br />
1 PTVM-100, Station 2 - adjustment of the furnace mode, ecological, heat and<br />
technical adjustment with optimization of the exhausted harmful substances<br />
At the enterprises of Odessa Heat Supply Network'<br />
1 There were carned out ecological, heat and technical tests of the water heating<br />
bOIlers at the following bOiler houses<br />
Severnaya-1 <br />
Northern<br />
Yuzhnaya-1 <br />
Southern<br />
Chuboska -<br />
BOilers PTVM-50, No 1 and 2<br />
BOilers PTVM-1 00 I No 3 and 4<br />
Boilers PTVM-50, No 1,2,3 and 4<br />
BOIlers KBGM-50, No 3 and 5<br />
Besides on the steam boilers of Odessa Steam Power Plant they regularly carned out work<br />
aimed at correcting the mode gUidelines after a long term non-operation of the equipment,<br />
In case of operating the bOilers, on a combined fuel (gas + mazut), determination of the<br />
operation charactenstlcs of the bOilers on the ground of the results of the gas analySIS<br />
(leakages along the gas path of bOIler) There were also carned out express tests of the<br />
bOilers before their repair and after repairing to evaluate the fulfilled repair works<br />
CONCLUSIONS<br />
DUring the period of operation of the Instrument Enerac 2000, the speCialists from the<br />
group for adjustment of the heat and technical eqUipment of Enterprise Adjustment one<br />
can come to the following conclUSions<br />
Operation of the Instrument for determination and adjustment of the optimal<br />
combustion mode for a set load gives reduction of the working time by 50-60%<br />
The effiCiency of carrying out of adjustment and regulation (controlling) of the<br />
furnace process as the bOiler IS rising on account of reduction of the time for making<br />
samples, and It Increases the capacity of the bOiler by 0 8 - 1 2% due to the<br />
preCISion of the Instrument readings<br />
Work With the Instrument Enerac 2000 IS of large effect In the work of the operations<br />
people of the bOilers concerning corrections of the furnace mode when working In<br />
the non-stationary modes of the bOiler work, as well as It gives a large reduction of<br />
time when fulfilling the mode and adjustment and also ecological and heat and<br />
technical tests of a bOiler With the aim of making the mode gUidehnes as well as the<br />
ecological and heat and technical charactenstlcs of the bOiler<br />
Remarks (or comments) (concerning the organization and service maintenance)<br />
9