chromatograph They believe the control house is too small and want to build a new 3m<br />

x 3m bnck bUIlding, but have no money They are concerned about regulatIons, safety and<br />

maintenance. They will take the sample line off of main before onfice run. They are<br />

planning to Install display control unit in laboratory. After much discussion, they think they<br />

can clean up the control house and Install GC In there by August 8.<br />

The employees haven't been paId until today, 25 August, 30% of their December 1996<br />

salary The plant could not even find enough money to buy mIlk for the kindergarten<br />

children. They need money to buy freon for the turbine bUilding overhead crane cab aIr<br />

conditioner, where temperature reaches <strong>12</strong>0°F<br />

It IS hard to get people motivated, even though they are highly skilled and expenenced<br />

The plant stll1 generates power when they can get enough fuel, and do not get paId for the<br />

power It IS a catch-22 sItuation where they know they need modern Instruments to<br />

measure and analyze fuels to save large sums of money and energy, but no money to<br />

even buy spare <strong>part</strong>s and supplies<br />

We did not get information on results from uSing the Fluke power analyzer as the specialist<br />

was said to be on vacation<br />

Sat. July 26. 1997 - Travel to Simferopol<br />

Sun. July 27.1997 - Rest and wntlng notes<br />

Mon and Tues. July 28-29. 1997 - In Simferopol CHP Plant<br />

PERSONS MET DURING MEETINGS:<br />

Anatohy K Voronovskly - Chairman of the Board, Director, Knmenergo<br />

Alexander Chupnnko - Director of Simferopol Power Plant<br />

Vladimir Cherkosov - ChIef Engineer<br />

Vaslly V. Kurlnnoy - Worked at all seven power plants<br />

Valery Bablchev - Chief of Technical De<strong>part</strong>ment (computer expert)<br />

Alexander Dublnets - Chief of Electncal Works<br />

Valery Duzhenko - ChIef of Electncal Laboratory<br />

Sergey KOJevntkov - Chief of BOiler and Turbine Works<br />

Alexander Lltvlnov - ChIef of Automatic and Measunng EqUipment De<strong>part</strong>ment<br />

INSTRUMENTS SUPPLIED TO SIMPEROPOL CHP PLANT<br />

Zirtek oxygen analyzers (2) probes for one bOiler, one two-channel analyzer<br />

Panametncs two channel ultrasonic transit time flow meter<br />

Panametncs one channel ultraSOniC transit tIme flow meter<br />

Instromet natural gas chromatograph, display control Unit and accessories<br />

Oxygen cell and consumables for Enerac<br />

DISCUSSION<br />

Valery Bablehev - Chief of Technical De<strong>part</strong>ment IS trying to develop a computenzed<br />

4