4"12-Z 1 - part - usaid
4"12-Z 1 - part - usaid 4"12-Z 1 - part - usaid
EXECUTIVE SUMMARY INTRODUCTION GENERAL DESCRIPTION OF THE PLANT COAL FEED SYSTEM PRELIMINARY AUDIT REPORT IMPROVING COMBUSTION EFFICIENCY BVRSHTYN POWER PLANT TABLE OF CONTENTS NATURAL GAS AND MAZUT FEED SYSTEMS COMBUSTION CONTROLS ENVIRONMENTAL MONITORING CONDENSER COOLING WATER BOILER MAKEUP WATER AND CITY WATER TREATMENT DISTRICT HEATING REHABILITATION PLANS MANAGEMENT CAPABILITIES ATTACHMENTS 1 TO 13 S906-02JTOC.1/1219194 i PAGE 1 4 4 4 5 5 5 6 6 6 6 7
- Page 79 and 80: • • • • • BURSHTYN COAL Q
- Page 81: • • • • Polsky Coal Pure Pr
- Page 86: l,rJ., I BURSTHYN 1994 Jan Feb Mar
- Page 91 and 92: 5906-01I02A1APPENDIX/41l8/95 APPEND
- Page 93: 5906-01/fJ2A/APPENDIXJ41l8/95 APPEN
- Page 96: 5906-01I02A/APPENDIX/411 8/95 APPEN
- Page 100 and 101: • • • BOIlPOCHHK flO YKYtDIIE
- Page 103 and 104: • • 5906-01 f02B/8f31197l8ursht
- Page 106 and 107: • • • • ) ) mass flow meter
- Page 108: ) Audit Equipment RECOMMENDATIONS B
- Page 111: • • t J • • • • ,-",I B
- Page 122 and 123: ') CHECKLIST IMPROVING COMBUSTION E
- Page 126 and 127: EXECUTIVE SUMMARY PRELIMINARY AUDIT
- Page 128 and 129: The above recommendations are preli
- Page 131 and 132: CONDENSER COOLING WATER Condenser c
- Page 133: AlTltCJtHENT 1 BURSHTYN ClIP PLANT
- Page 152: • • • • • existing oxygen
- Page 160 and 161: • which typically for all electro
- Page 162 and 163: Vladimir Pachura - SeniorMaster. He
- Page 164 and 165: • • • chromatograph They beli
- Page 166 and 167: were starting a bOiler, 370°C, 40
- Page 168 and 169: In Plant Cost to Produce Import Pow
- Page 170 and 171: • • • A low life time resourc
- Page 172 and 173: • • • • • • paid Decemb
EXECUTIVE SUMMARY<br />
INTRODUCTION<br />
GENERAL DESCRIPTION OF THE PLANT<br />
COAL FEED SYSTEM<br />
PRELIMINARY AUDIT REPORT<br />
IMPROVING COMBUSTION EFFICIENCY<br />
BVRSHTYN POWER PLANT<br />
TABLE OF CONTENTS<br />
NATURAL GAS AND MAZUT FEED SYSTEMS<br />
COMBUSTION CONTROLS<br />
ENVIRONMENTAL MONITORING<br />
CONDENSER COOLING WATER<br />
BOILER MAKEUP WATER AND CITY WATER TREATMENT<br />
DISTRICT HEATING<br />
REHABILITATION PLANS<br />
MANAGEMENT CAPABILITIES<br />
ATTACHMENTS 1 TO 13<br />
S906-02JTOC.1/<strong>12</strong>19194 i<br />
PAGE<br />
1<br />
4<br />
4<br />
4<br />
5<br />
5<br />
5<br />
6<br />
6<br />
6<br />
6<br />
7