• • • BOIlPOCHHK flO YKYtDIIEHHIO KIIlI CrOPAHlUI HA YKPAI1HCKHX 3JIEKTPOCTAHlllIJlX CnelIYlOUICUI pa60Ta 6YlIeT npOBelIeHa Ha KmKlIOIl 113 :meKTpOCTaHUHIl. KaK MHHHMyM: ... ... ... ... ... ... ... ... ... ... ... ... ... ... flpelICTaBJIeHHe II 06MeH HHepopMallHell C PYKOBOlICTBOM CTaHUHH 06cy>KlIeHHe H npelICTaBJIeHHe 06beMa pa60T OueHKa TeXHHlleCKHX H OpraHH3allHOHHhIX B03MO>KHOCTeIl YCTaHOBJIeHHe B03MODhIX uanpaBJIeUHIl COTpylIUHlleCTBa flo B03MO>KHOCTH OnpelIeJIeHHe nOMOUIH Ha MeCTaX OnpelIeJIeUHe H KOOplIlfUHpOBaHHe pa60llerO rpaepHKa lIHCxyCCHH C nepCOHaJIOM. OTBellalOUIHM 3a pa60ry CTaUUHH OnpelIeJIeHHe UaJIHllHH CYUIeCTBYIOUIHX HCTOtIHHKOB IIUepoPMallHH H lIaUUhIX OnpelIeJIeHHe lIaUUhIX 0 pa60Te CTaHUHH ua BCeM npOTIDKeHHH ee cymeCTBOBaUHH BH3HT Ha CTaUUHIO lIJIH OnpelIeJIeUHH Tpe60BaUHA K BhI6pauBoMy H3MepHTeJIhBOMY 060PYlIOBaHHIO: AH3JIH3aTOPhI cropauHH ClleTllHKH nOTOKa TOnJIHBa (ra3, ue$I'b HJlH yrOJIb) KHCJIOpOlIHhIe aHaJIH3aTOPhI 03UaKOMJIeUHe C cymeCTBYIOUlHMH llepTexcaMH no Tpy6onpoBOlIaM H H3MepHTeJlbBOA TeXHHKe lIJIH OnpelIeJIeUHH MeCTouaxO>KlIeUHJI nyHKTOB MOHHTOpHHra OnpelIeJIeHHe epH3HlleCKoro MeCTOnOJIO>KeHHJI lIJIJI YCTaBOBKH nepBHllBoro 3JIeMeHTa OnpeneJIeUHe MeCTOnOJIO>KeHHJI lIJIJI YCTaHOBKH lIHCTaHUHOHHhIX MOlIYneit MOHHTOpHHra non6op nepCOH3JIa lIJIJI 06YlleHHJI Ha Mecrax HaBbIKaM npOBeneHHIO aynHTa
CHECKLIST Il\iPROVING COMBUSTION EFFICIENCY UKRAINIAN POWER PLANTS The following work will be performed at each plant, as a minimum· • Introduction and information exchange with plant management • Discussion and presentation ofthe scope ofwork • Identify the persons to be assigned for hands-on audit training • Provide training and assistance to the team selected on the use ofthe demonstration portable instrumentatIOn • Perform audit tests • Leave behind the demonstration portable instruments • Determine physical locations for installing the stationary instruments • Determine locations for installing the remote monitoring modules • Determine physical characteristics related to the locations for the stationary instruments
- Page 49: SPECIFICATIONS CD OXYGEN SENSING EQ
- Page 53: .- The 1261 Calorimeter Operates in
- Page 58 and 59: 14 The 1750 Proximate Analyzer A ra
- Page 68: 5906-01/C12A1APPLNDIX/4/18/95 APPEN
- Page 79 and 80: • • • • • BURSHTYN COAL Q
- Page 81: • • • • Polsky Coal Pure Pr
- Page 86: l,rJ., I BURSTHYN 1994 Jan Feb Mar
- Page 91 and 92: 5906-01I02A1APPENDIX/41l8/95 APPEND
- Page 93: 5906-01/fJ2A/APPENDIXJ41l8/95 APPEN
- Page 96: 5906-01I02A/APPENDIX/411 8/95 APPEN
- Page 103 and 104: • • 5906-01 f02B/8f31197l8ursht
- Page 106 and 107: • • • • ) ) mass flow meter
- Page 108: ) Audit Equipment RECOMMENDATIONS B
- Page 111: • • t J • • • • ,-",I B
- Page 122 and 123: ') CHECKLIST IMPROVING COMBUSTION E
- Page 125 and 126: EXECUTIVE SUMMARY INTRODUCTION GENE
- Page 127 and 128: 9) Four (4) 02 analyzers rated for
- Page 129: INTRODUCTION ENERGO SYSTEM: LOCATIO
- Page 132 and 133: PC boilers. They are also intereste
CHECKLIST<br />
Il\iPROVING COMBUSTION EFFICIENCY<br />
UKRAINIAN POWER PLANTS<br />
The following work will be performed at each plant, as a minimum·<br />
• Introduction and information exchange with plant management<br />
• Discussion and presentation ofthe scope ofwork<br />
• Identify the persons to be assigned for hands-on audit training<br />
• Provide training and assistance to the team selected on the use ofthe demonstration<br />
portable instrumentatIOn<br />
• Perform audit tests<br />
• Leave behind the demonstration portable instruments<br />
• Determine physical locations for installing the stationary instruments<br />
• Determine locations for installing the remote monitoring modules<br />
• Determine physical characteristics related to the locations for the stationary<br />
instruments