12.07.2015 Views

Answer Solutions Specification Guide - OEC Business Interiors

Answer Solutions Specification Guide - OEC Business Interiors

Answer Solutions Specification Guide - OEC Business Interiors

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Stability <strong>Guide</strong>lines<strong>Guide</strong>lines for Wall-Start Junction ConfigurationsPanels with ComponentsWall-startjunction12' max.Wall-startjunctionIn a 12' run using a Wall hang channels forwall-start junction, shelves and overhead storagean end panel must be used bins cannot be used with awith the wall-start junction wall-start junction.and the other end must besupported by a full panel,and end panel, or a pedestalwith a filler. For 24"D worksurfaces,the center can besupported by a cantileverwhen bins and worksurfacesare used on both sides (asshown). 30"D straight andtransition worksurfacesTip: Wall-start junctionsrequire additional floor supportalong the front edge,must secure to the stud in abuilding wall or use drywallsuch as a pedestal or postfasteners.leg. A cantilever and singlepost leg must be used whenhanging components on oneside only..12' max..Panels<strong>Answer</strong> <strong>Solutions</strong> <strong>Specification</strong> <strong>Guide</strong> cStability <strong>Guide</strong>lines, continued 59

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!