12.07.2015 Views

Answer Solutions Specification Guide - OEC Business Interiors

Answer Solutions Specification Guide - OEC Business Interiors

Answer Solutions Specification Guide - OEC Business Interiors

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Stacking Junctions, continued.Surface MaterialsStacking junction• Black paintJunction is hidden whenproperly installed.Vertical trim• Paint• Vertical surface fabric(option)• Wood veneer (option).Application TopicsStacking Stability<strong>Guide</strong>lines providesdetailed information onapplications.cPage 47Maximum height thatcan be stacked on a basepanel is 36", consisting ofone 24"H and one 12"Hstacking junction.Maximum height that an<strong>Answer</strong> panel configurationcan reach is 90".Maximum number ofstacking junctions thatcan be added to a basepanel is two.Any height base panelcan be used with stackingjunctions.Bins and shelves canhang from the first stackedtier only. Use only <strong>Answer</strong>hanging components. Avenirbins are not allowed.For initial installationsorder the appropriate topcap for your stacked segment,while you are specifyingthe base panel..ShortenedTop CapStandardTop CapFor retrofit installationsyou may have toorder a new top cap throughCustomer Service Partsbased on applicationchanges. Example: astandard top cap must bespecified through CustomerService Parts when convertingan existing change-ofheightconfiguration to asame-height configuration.Order a standard top capto replace the shortened topcap.When adding stackingjunctions to base panelsmade prior toJanuary 2000, you mustreplace vertical trim on endof-runbase junction. Werecommend replacementof L base junction trim andstandard change-of-heighttrim because the new trimcan be easily removed,while the existing trim willbe trapped by the stackingjunction. To determine if youhave trim made prior toJanuary 2000, remove trimpiece. If there are hooksat the top of your trim, youneed to replace it. Replacementtrim is availablethrough Customer ServiceParts.Consolidation point kitcannot be used with stackingcomponents....24 <strong>Answer</strong> <strong>Solutions</strong> <strong>Specification</strong> <strong>Guide</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!