12.07.2015 Views

Answer Solutions Specification Guide - OEC Business Interiors

Answer Solutions Specification Guide - OEC Business Interiors

Answer Solutions Specification Guide - OEC Business Interiors

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Universal Systems WorksurfacesExtended Corner, Straight-Front and Curved-Front Worksurfaces, continued.12 1 /2"12 1 /2"Cable scallops arelocated 12 1 ⁄2" from the rearcorner of the worksurface tothe center of the scallop.Cable scallop can beomitted for freestandingapplications or panel-supportedapplications whereplugs do not need to passover the back edge of theworksurface.Cable managementdevices are available tohelp manage conventionaland fiber-optic cablesbeneath the worksurface.cSee page 205,Worksurface Power andCommunication.Surface MaterialsApplication TopicsLaminate WorksurfacesP-Edge Profile• LaminateApplication Rules• Accent laminate (option)A family of pre-approved,non-Steelcase laminatesthat reflect the latest trendsin color.cSee Surface MaterialsReference Manual.• Open Line laminate(option)A program including non-Steelcase laminates whichare suitable for use onSteelcase products.cSee Surface MaterialsReference Manual.Front (user’s) edge(s)• Vinyl (plastic)Back and side edges• Plastic color default tomatch user’s edgeCable scallop• Plastic color default toP-edge profiles will pro-complement user’s edgeduce a valley when installedperpendicular to adjacentWood Veneerworksurfaces. The additionalWorksurfaces3⁄8" depth of P-edge profiles• Wood veneer (standard)causes an interference fit• Customiz stain (option)in on-module applications.• Full-fill finish (option)For U-configurations usinga straight and extendedSquare (3 mm) edgecorner, the 3 mm edge pro-profilefile is recommended.• Wood veneer to matchworksurface15"Front (user’s) edge(s)15"• Wood edge bandCable scallop43 1 /2"• Plastic: black onlyScreens mount to worksurfacesin privacy position orbelow the worksurface formodesty.cSee page 199 for Screens.Worksurfaces usedin panel-supportedinstallations must followapplicable panel stabilityguidelines.cPage 47...ShippingPalletizing streamlinesunloading and staging ofworksurfaces. Identicalworksurfaces ordered on thesame line item are packedon pallets containing 10–20worksurfaces. Remainingworksurfaces are packedindividually in cartons. If palletizingis not desired, orderin quantities of nine or lessper line item. For maximumunload efficiency, utilizepallet handling equipment atjob site whenever possible.Wood veneer worksurfacescannot be palletized...114 <strong>Answer</strong> <strong>Solutions</strong> <strong>Specification</strong> <strong>Guide</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!