12.07.2015 Views

Network Statement 2014 - Slovenske železnice

Network Statement 2014 - Slovenske železnice

Network Statement 2014 - Slovenske železnice

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Slovenske</strong> železnice - Infrastruktura d.o.o. – <strong>Network</strong> <strong>Statement</strong> of the Republic of Slovenia <strong>2014</strong> – 9.12.2012 – 0other foreign Infrastructure Managers, elaborates and coordinates the pathconstruction for the train course all through the PRI of the RS. The Agencyforwards the elaborated and coordinated construction to the ordering party –foreign Manager. The Undertaking/ordering party, based on the prepared andcoordinated construction, orders train path at the Agency, in accordance to theprescribed procedure.4.2.2. Train Path ConstructionThe Agency shall prepare the construction in such a way as to make the most use of theRailway Infrastructure and, at the same time, to address the Applicants’ wishes.During a train path construction the Agency should address all requirements, indicated fortrain path construction, as much as possible.The Agency, before starting the train path construction, prepares a path catalogue, wherethe unoccupied routes are shown, to promptly address the received applications for pathallocation and construction.Train path construction is carried out in the following order: train paths of passenger trains within the public service obligation in passengercarriage in domestic and cross border traffic; train paths of other passenger trains; train paths of trains running through the stations, where they have plannedconnection with other trains; pre-arranged international train paths for freight trains in accordance withRegulation No. 913/2010 of the European Parliament and of the Council concerning aEuropean rail network for competitive freight (Official Journal of the EU, No.276,dated 20 th October 2010), train paths of the Framework agreement are taken into account prior to newordered; train paths according to the time of the train path order (requests in regularprocedure are taken into account before requests in late procedure); international train paths before train paths in domestic traffic, train paths that provide better usage of the PRI and a wider range of services prior tothe train paths which utilize PRI to a lesser extent; train paths of trains running on the single-track line on the part of the route.Construction of train paths for locomotive run in junction stations does not perform, onlyspeed and journey time are determined. The Agency shall forward this data to the IM.Train path for intervention train has priority over all other trains, when it is sent in order tohandle the troubles and ensure normal traffic conditions.In case of obstacles in traffic the extra train paths (not provided for by the timetable) tomake a detour must be determinated. The IM set down to the train available, alreadyconstructed train path, and inform the Agency of this use.After train path construction the route offers from the path catalogue can be published incatalogue of available train paths and are available to applicants in case they need ad-hoctrain paths.PAGE 42

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!