12.07.2015 Views

download the brochure - Air Barrier Association of America

download the brochure - Air Barrier Association of America

download the brochure - Air Barrier Association of America

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The <strong>Air</strong> <strong>Barrier</strong> <strong>Association</strong> <strong>of</strong> <strong>America</strong> Inc.<strong>Air</strong> <strong>Barrier</strong>s: What Contractors needto know in order to decrease <strong>the</strong>ir riskThe <strong>Air</strong> <strong>Barrier</strong> <strong>Association</strong> <strong>of</strong><strong>America</strong> (ABAA) consists <strong>of</strong> variousstakeholders in <strong>the</strong> building enclosureindustry.Our focus is to promote <strong>the</strong> use andbenefits <strong>of</strong> air barrier systems, and tolead our industry into <strong>the</strong> future in aprogressive and pr<strong>of</strong>essional manner.Be part <strong>of</strong> those leading <strong>the</strong> industry.Why not lead your competition instead <strong>of</strong>following? Several states have alreadyadded air barriers in <strong>the</strong>ir building code,such as Georgia, New York, Massachusettsand many more States are following.These developments, along with <strong>the</strong> recentaddition <strong>of</strong> air barriers into standardssuch as ASHRAE 90.1, IECC and IRC willundoubtedly result in a significant increasein air barrier assemblies being installedin our buildings. In addition, <strong>the</strong> currentversion <strong>of</strong> LEED references ASHRAE90.1-2010 as <strong>the</strong> baseline standard forLEED buildings. This means that all LEEDbuildings will require air barriers as amandatory component.<strong>Air</strong> <strong>Barrier</strong> <strong>Association</strong> <strong>of</strong> <strong>America</strong>, Inc.1600 Boston-Providence HwyWalpole MA 02081Email us: abaa@airbarrier.orgCall us: 1-866-956-5888


www.airbarrier.orgWhat <strong>the</strong> ABAA Quality AssuranceProgram does for your Project.The damages resulting from an improperly installedair barrier can be enormous, including but not limited toexterior wall deconstruction and restoration, possiblemold remediation, and damages due to <strong>the</strong> loss <strong>of</strong>building use. For <strong>the</strong> General Contractor and/orConstruction Manager, participation in <strong>the</strong> ABAA QualityAssurance Program (QAP) is a prudent risk managementstrategy that can reduce liability and exposure for costsresulting from building envelope failure.All aspects <strong>of</strong> ABAA’s QAP, including installer trainingand certification, contractor accreditation, audits, conflictresolution and paperwork review are handled throughan independent and impartial pr<strong>of</strong>essional organization.The QAP consists <strong>of</strong> many assurance components insequence, all working toge<strong>the</strong>r to provide a high level <strong>of</strong>confidence that <strong>the</strong> air barrier will be installed correctlyand to <strong>the</strong> applicable industry standards.ABAA contractors must undergo training, anddemonstrate a high quality <strong>of</strong> workmanship andpr<strong>of</strong>essionalism in order to be associated with <strong>the</strong>program.ABAA licensed auditors are assigned to inspect eachproject to ensure that <strong>the</strong> installed air barrier meets orexceeds standards set by <strong>the</strong> designers, manufacturers,and ABAA specifications. Upon completion <strong>of</strong> eachaudit, an audit report is provided to <strong>the</strong> <strong>Air</strong> <strong>Barrier</strong>Contractor, General Contractor/Construction Manager,and <strong>the</strong> Design Pr<strong>of</strong>essional to verify <strong>the</strong> installation anddocument <strong>the</strong> Auditor’s observations, testing results,and identify any corrective actions that may be required.Identifying potential problems during <strong>the</strong> inspection stagereduces, if not eliminates future, more costly repairs.Specifying ABAA is a win-win for all parties involved,including building owners, design pr<strong>of</strong>essionals,contractors and end users.Benefits <strong>of</strong> <strong>the</strong> ABAA program to your projectinclude:• Experienced subcontractors• Enhanced schedule• Risk management• Field inspection, testing and auditing• Documentation <strong>of</strong> delivery <strong>of</strong> contractual requirementsNow what really matters: The CostThe costs are $0.085 per square foot <strong>of</strong> installedmaterial for an Industry Development Fund Fee, and$2,000 per audit. These associated ABAA costs areincluded in <strong>the</strong> ABAA contractor’s bid.Required site audits can be calculated as follows:Square Footage<strong>of</strong> ProjectUp to 10,000 110,001 to 35,000 235,001 to 75,000 375,001 to 125,000 4125,001 to 200,000 5200,001 and over 6What you can expect from yourABAA Contractor.• Daily work reports indicating location <strong>of</strong> work, testresults, environmental conditions, etc• Daily quality control measures including visualinspection, adhesion/cohesion testing, thicknessand/or density testingNumber <strong>of</strong>Audits Required• Highly trained and credentialed installer(s) on siteoverseeing all aspects <strong>of</strong> <strong>the</strong> installation• Knowledge to work out air barrier constructiondetails and sequence scope <strong>of</strong> workTips for a successful <strong>Air</strong> <strong>Barrier</strong>Installation1. Conduct pre-construction meetings2. Ensure proper scheduling and sequencing <strong>of</strong>wall assembly3. Coordination <strong>of</strong> all pertinent trades4. Construct mock ups <strong>of</strong> building wall sections5. Oversee testing and inspection6. Protect assemblies and materials duringconstructionNeed project specific assistance? ABAA provides free Technical Support!Call: 1-866-956-5888ABAA 115-101 Rev 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!