12.07.2015 Views

Noise and Vibration Assessment

Noise and Vibration Assessment

Noise and Vibration Assessment

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Mobile Equipment. Maximum sound levels for nonscheduled, intermittent, short-term operation(less than ten days) of mobile equipment:R-1, R-2ResidentialR-3 <strong>and</strong> aboveMulti-Family Commercial/IndustrialResidentialDaily, 7:00 a.m. to 7:00 75 dBA 80 dBA 85 dBAp.m.Weekends, 9:00 a.m. to8:00 p.m. <strong>and</strong> legal holidays60 dBA 65 dBA 70 dBAStationary Equipment. Maximum sound levels for repetitively scheduled <strong>and</strong> relatively long termoperation (period of ten days or more) of stationary equipment:R-1, R-2ResidentialR-3 <strong>and</strong> aboveMulti-Family Commercial/IndustrialResidentialDaily, 7:00 a.m. to 7:00 p.m. 60 dBA 65 dBA 70 dBAWeekends, 9:00 a.m. to8:00 p.m. <strong>and</strong> legalholidays50 dBA 55 dBA 60 dBA8. <strong>Vibration</strong>. Operating or permitting the operation of any device that creates a vibrationwhich annoys or disturbs at least two or more reasonable persons of normalsensitiveness who reside in separate residences (including apartments <strong>and</strong>condominiums) at or beyond the property boundary of the source if on privateproperty or at least one hundred fifty feet (forty-six meters) from the source if on apublic space or public right-of-way.City of Oakl<strong>and</strong> Planning CodeConstruction noise in Oakl<strong>and</strong> is regulated in the Planning Code as follows:Section 17.120, Performance St<strong>and</strong>ardsG. Temporary Construction or Demolition Which Exceed the Following <strong>Noise</strong> LevelSt<strong>and</strong>ards.1. The daytime noise level received by any residential, commercial, or industrial l<strong>and</strong> usewhich is produced by any nonscheduled, intermittent, short-term construction ordemolition operation (less than ten (10) days) or by any repetitively scheduled <strong>and</strong>relatively long-term construction or demolition operation (ten (10) days or more) shallnot exceed the maximum allowable receiving noise levels described in Table 17.120.04.Formatted: Numbered + Level: 1 +Numbering Style: A, B, C, … + Start at: 7 +Alignment: Left + Aligned at: 0.5" + Tab after:0.75" + Indent at: 0.75"Table 17.120.04 (Table 5) establishes the maximum allowable receiving noise levels:Table 5 Table 17.120.04, Maximum Allowable Receiving <strong>Noise</strong> Level St<strong>and</strong>ards, dBA10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!