12.07.2015 Views

Operation Manual - ASSMANN IT-Solutions AG

Operation Manual - ASSMANN IT-Solutions AG

Operation Manual - ASSMANN IT-Solutions AG

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4.5.1 LP 3/5/6-11: standard installation procedureIf a battery extension pack is to be installed, please proceed with section 4.5.2.If 2, 3 or 4 parallel operating units will be installed, please proceed with section 4.5.5.The numbers between (brackets) refer to figure 12 in section 5.1.1. Make sure that all circuit breakers (7-8-9) are in ‘off’position (down).12. Loosen the 3 screws and remove the metal cover (11)of the I/O terminals.233. Lead the input/output cables through the swivels ofthe metal cover (11).4. Input (11a). Connect the mains supply wires to theterminals 2 (Line) and 3 (Neutral) and the ground wireto terminal 1. Ground connection is essential!5. Output (11b). Connect the load wires to the terminals4 (Line) and 5 (Neutral) and the ground wire toterminal 6. Ground connection is essential!6. Re-install the metal cover (11). Fasten the cables in theswivels. Insert the battery fuse in the fuse holder (17)and close the fuse holder.457. An emergency shutdown switch can be connected toconnector J3 on the RS232/Contact Interface Card,between pins 3 and 4. See section 6.2 for moreinformation.68. For advanced communication possibilities, theRS232/contact interface port (12a) can be connectedto a computer system. See section 6.1 for moreinformation. *9. The middle ‘option slot’ (13) allows easy installation ofplug-in cards: SNMP Card or Relay Card. Seesections 6.3 and 6.4 for more information. *78see 6.3-4BATTERYDISCONNECTEDEMERGENCYSHUTDOWNstand-aloneand RPA cardavailable10. The right ‘option slot’ (14) allows easy installation ofthe RPA-card (Redundant Parallel Architecture). If thecard is already mounted, and if the unit is intended tobe used stand-alone, a bus terminator (delivered withthe unit) has to be placed in one of the two busconnectors on the card. If the unit will be part of aparallel system, see sections 4.5.5 and 7.3 for moreinformation. *910see 4.5.5 / 7.3* The data cables can be attached to the cabinet withtie-wraps, position the tie-wraps in the small holes(18) underneath the option slots.Figure 6. LP 3/5/6-11:Standard installation procedure11. Connect the utility power to the UPS.12. For a quick start proceed with section 5.2 ‘Start-up’.OPM_LPE_11X_3K0_10K_1GB_V041 9 GE DE LP 11 UPS: User manual 4.1 (GB)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!