12.07.2015 Views

A1(T) Elkesley Junction Improvements - Highways Agency

A1(T) Elkesley Junction Improvements - Highways Agency

A1(T) Elkesley Junction Improvements - Highways Agency

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

LAeq,TLAMAXis the A-weighted equivalent continuous sound level during the sampleperiod (T) and effectively represents an average energy value.is the maximum A-weighted sound level during the sample period; thehighest level of environmental noise during the measurement.Table 9.6 - Summary of ambient noise levels in the vicinity of the Preferred OptionI.DMonitoringLocationLocationDescriptionTime(hrs)DateTimePerioddBL AeqOverall LeveldBL <strong>A1</strong>(T)0dBL A90dBL AMAXCommentsMP1JockeyLaneFree-field,1.5m aboveground,100m from<strong>A1</strong>(T)carriageway,soft ground3 18/03/200910:15–13:1564.7 63.1 54.9 93.5Noisecaused byroad trafficmovementson <strong>A1</strong>(T),lightaircraft,HGVsMP2Yew TreeRoadFree-field,1.5m aboveground. 2mfrom YewTree Road,soft ground3 19/03/200910:15–13:1555.3 57.1 51.7 86.3Noisecaused byroad trafficmovementson <strong>A1</strong>(T),lightaircraft,HGVsWithin paragraph 43 of the CRTN document a procedure is presented for a“Shortened measurement procedure” where for practical reasons measurementcannot be undertaken over the full 18 hour period. The monitoring undertaken andreported above was undertaken in line with this shortened methodology acquiring 3hours worth of data at each location between the hours of 10:00 and 17:00.The shortened method then provides a formula for the conversion of the L<strong>A1</strong>(T)0,3hour to an L<strong>A1</strong>(T)0, 18hour as detailed below:L<strong>A1</strong>(T)0, 18hr = L<strong>A1</strong>(T)0, 3hr – 1dBDiscussion of the measured noise levels below concerns the corrected L<strong>A1</strong>(T)0,18hour levels as calculated from the measured L<strong>A1</strong>(T)0, 3 hour levels using theprocedure as outlined above.Noise Model PredictionsWithin the assessment of the proposed <strong>A1</strong>(T) <strong>Elkesley</strong> scheme noise levelsassociated with road traffic noise have been modelled using supplied traffic flow datafor 2007. Table 9.7 below details the results of this baseline modelling at the nine78

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!