Area F: Enclosed Arable Farmland (Good Quality Landscape of Medium Value)There will be no change in terms of impacts on landscape character to this area.Impacts on Visual AmenityThe predicted visual impacts on all of the identified receptors are detailed in Table1.6 below. Impacts are based on the Stage 2 design proposal, which include anymitigation measures that were developed and included as a part of the designversion for assessment purposes.Additional mitigation is described in Section 6.4 and outlined as appropriate in thetable. The predicted effects at year of opening (year 0) and in the design year (year15) take these additional mitigation measures into account.The impact tables take into account any additional visual impacts that have beenidentified from analysis of lighting requirements associated with the schemeproposal.An assessment is made of impacts during construction, as an indication of the levelsof visual impact anticipated. However, this assessment is unable to account for theduration of work programme, location of compounds, access roads, etc and thereforecannot provide a definitive measure of the visual impacts encountered by specificproperties during the construction period.53

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!