5.6 Residual EffectsDisruption during construction of the scheme there would be impacts due to theconstruction of the bridge and widening of Coalpit Lane. The adverse impacts(section 5.4) of the Preferred Version will be mitigated against where possible, andagreed to an acceptable level in-line with local EHO requirements.It has been concluded that with the implementation of the proposed mitigation andmanagement measures there would be no long-term effects.35