29.11.2012 Views

Federal Bureau of Prisons FCC Petersburg Super ESPC Project

Federal Bureau of Prisons FCC Petersburg Super ESPC Project

Federal Bureau of Prisons FCC Petersburg Super ESPC Project

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ECM 7: Controls Upgrades<br />

• Constellation upgraded the HVAC controls at the Low, Medium, and Camp facilities.<br />

• This involved two types <strong>of</strong> work:<br />

1. General upgrades to HVAC controls, including installation <strong>of</strong> programmable<br />

thermostats and installation <strong>of</strong> heating water reset controls<br />

2. Re-commissioning DDC control and upgrading to Tridium-based s<strong>of</strong>tware<br />

• The Low complex has buildings served by stand-alone equipment, while the<br />

Medium complex has a JCI system with a front-end in the central plant.<br />

• The stand-alone controls are inefficient, outdated, and uncomfortable for inmates,<br />

while the JCI systems needed to be re-commissioned and upgraded to restore<br />

efficiency strategies.<br />

26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!