ActivityID+ Project DesignActivityDescriptionOrig Resource % CurrentDur Comp ID EarlyStartCurrentEarlyFinishWPHSBudgetedPMCost104 06JUN06A 31OCT06A 271,4792007 2008 2009 2010J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J FMAR+ Project DSA Review175 30JUL06A 06APR07 0+ Project Bid and Award184 23AUG05A 10MAY06A 0+ Project <strong>Construction</strong>230 02JAN08 21NOV08 2,745,832+ FF&E193 23APR08 27JAN09 500,691+ Project CloseOut127 24NOV08 25MAY09 0Design<strong>Build</strong> Campus Corner Sign+ PreDesign / Programming18* 01NOV05A 28NOV05A 0+ Project Design639 04AUG04A 05FEB07 275,993+ Project DSA Review658 20SEP04A 17APR07 0+ Project Bid and Award184 23AUG05A 10MAY06A 0+ Project <strong>Construction</strong>134 01MAR07 07SEP07 916,566+ Project CloseOut23 10SEP07 10OCT07 0Design<strong>Build</strong> Athletic Field House, Stadium+ PreDesign / Programming819 12AUG02A 26OCT05A 53,460+ Project Design774 01DEC03A 08DEC06A 1,641,150+ Project DSA Review169 30JUL06A 29MAR07 0+ Project Bid and Award191 12AUG05A 10MAY06A 0+ Project <strong>Construction</strong>362 27NOV06A 28APR08 17,109,881+ FF&E197 25JUN07 02APR08 998,850Start Date25JAN01Finish Date17MAY10Data Date31JAN07Run Date 02MAR07 12:27Early BarProgress BarCritical ActivityS017LACCDLos Angeles Southwest CollegeSheet 7 of 14Date Revision Checked ApprovedCampus Summary© Primavera Systems, Inc.