Project Overview 10,000 , FT long g x 150 FT wide � 10,000’ X 150’ Primary Departure Runway � 3,000’ x 75’ East end of Taxiway E � 260,000 SY Pavement Replacement � 16”PCC /6”Cement Treated or Graded Aggregate Base � New 20” PCC on 2” Asphaltic Cement Concrete Base (ACC) �� Replaced Pavement Underdrains � Overlaid Shoulders with ACC � Replaced Lighting
Project Schedule � Project Planning Started in 2002 � Construction Started September 8, 2006 � Project completed on November 5, 2006 � 59 ½ Days @ $85 million (ahead of schedule and $7 million below budget)
- Page 1 and 2: Hartsfield-Jackson Atlanta Internat
- Page 3: • 5 Runway System ATL Airfield Ov
- Page 7 and 8: Runway 8R/26L Rehabilitation - Mode
- Page 9 and 10: Modeling - Construction Option 1 Ph
- Page 11 and 12: Modeling - Construction Option 2
- Page 13 and 14: Design Lessons � Haul Road parall
- Page 15 and 16: Procurement Lessons � PPre-Qualif
- Page 17 and 18: BATCH PLANT AREA Large Erie Plant S
- Page 19 and 20: Small Erie Plant Fun Fact - Over 10
- Page 21 and 22: CEMENT TRAILERS - 15 EA Fun Fact -
- Page 23 and 24: CHILLERS - 5 Each The chillers were
- Page 25 and 26: Paving Equipment Resources � 2 GG
- Page 27 and 28: Pre-construction Planning Lessons
- Page 29 and 30: What-if Plans • Anticipate variab
- Page 31 and 32: Pre-construction Site Investigation
- Page 33 and 34: Test Strip - Low Slump Concrete
- Page 35 and 36: Test Strip - Slip Paving
- Page 37 and 38: Test Strip - Electrical
- Page 39 and 40: TEST STRIP - Finished Product Fun F
- Page 41 and 42: Slab Dumpsite - 14 AC
- Page 43 and 44: Fun Facts �� The slabs removed
- Page 45 and 46: SUBGRADE PREPARATION - 67,800 SY Ov
- Page 47 and 48: ASPHALT PAVING - 70,300 TONS Fun Fa
- Page 49 and 50: The Job Progress g
- Page 51 and 52: Day 14
- Page 53 and 54: Day 39
Project Schedule<br />
� Project Planning Started in 2002<br />
� Construction Started September 8, 2006<br />
� Project completed on November 5, 2006<br />
� 59 ½ Days @ $85 million (ahead of schedule and<br />
$7 million below budget)