Presentation Outline � Project Overview � Airport Planning Lessons � Design Lessons � Procurement Lessons �� Estimating Considerations � Construction Pre-planning � Construction Execution � Keys to Success
• 5 Runway System ATL Airfield Overview • 2 Primary Arrival Runways • 2 Primary Departure Runways • 1 Mixed Use • Airfield Capacity – Arrivals – 126 8L – 45 9R – 36 10 – 45 – Departures – 118 8R – 50 9L – 38 10 – 30 � Runway 8R/26L - 37 years old
- Page 1: Hartsfield-Jackson Atlanta Internat
- Page 5 and 6: Project Schedule � Project Planni
- Page 7 and 8: Runway 8R/26L Rehabilitation - Mode
- Page 9 and 10: Modeling - Construction Option 1 Ph
- Page 11 and 12: Modeling - Construction Option 2
- Page 13 and 14: Design Lessons � Haul Road parall
- Page 15 and 16: Procurement Lessons � PPre-Qualif
- Page 17 and 18: BATCH PLANT AREA Large Erie Plant S
- Page 19 and 20: Small Erie Plant Fun Fact - Over 10
- Page 21 and 22: CEMENT TRAILERS - 15 EA Fun Fact -
- Page 23 and 24: CHILLERS - 5 Each The chillers were
- Page 25 and 26: Paving Equipment Resources � 2 GG
- Page 27 and 28: Pre-construction Planning Lessons
- Page 29 and 30: What-if Plans • Anticipate variab
- Page 31 and 32: Pre-construction Site Investigation
- Page 33 and 34: Test Strip - Low Slump Concrete
- Page 35 and 36: Test Strip - Slip Paving
- Page 37 and 38: Test Strip - Electrical
- Page 39 and 40: TEST STRIP - Finished Product Fun F
- Page 41 and 42: Slab Dumpsite - 14 AC
- Page 43 and 44: Fun Facts �� The slabs removed
- Page 45 and 46: SUBGRADE PREPARATION - 67,800 SY Ov
- Page 47 and 48: ASPHALT PAVING - 70,300 TONS Fun Fa
- Page 49 and 50: The Job Progress g
- Page 51 and 52: Day 14
• 5 <strong>Runway</strong> System<br />
ATL Airfield Overview<br />
• 2 Primary Arrival<br />
<strong>Runway</strong>s<br />
• 2 Primary Departure<br />
<strong>Runway</strong>s<br />
• 1 Mixed Use<br />
• Airfield Capacity<br />
– Arrivals – 126<br />
8L – 45<br />
9R – 36<br />
10 – 45<br />
– Departures – 118<br />
<strong>8R</strong> – 50<br />
9L – 38<br />
10 – 30<br />
� <strong>Runway</strong> <strong>8R</strong>/<strong>26L</strong> - 37 years old