29.11.2012 Views

Ice Makers – 6 Each Fun Fact – These ice makers Ice makers were can produce d 300 t tons of f i ice purchased for the job at a per day. That is the cost of $1,800,000. equivalent of 60,000 bags.

Paving Equipment Resources � 2 GGomaco 4000 pavers � 1 Gomaco 2800 paver � 1 GGomaco 2600 paver � 5 Concrete Placers � 3 Allen Screeds � 2 Leica wireless paving system Fun Fact – The 2800 paver was purchased for the job at a cost t of f $540,000. $540 000 Two Leica wireless paving systems were purchased for th the job j b at t a cost t of f $219,000 $219 000 per each.

Paving Equipment Resources<br />

� 2 GGomaco 4000 pavers<br />

� 1 Gomaco 2800 paver<br />

� 1 GGomaco 2600 paver<br />

� 5 Concrete Placers<br />

� 3 Allen Screeds<br />

� 2 Leica wireless<br />

paving system<br />

Fun Fact – The 2800 paver<br />

was purchased for the job at a<br />

cost t of f $540,000. $540 000<br />

Two Leica wireless paving<br />

systems were purchased for<br />

th the job j b at t a cost t of f $219,000 $219 000<br />

per each.