Procurement Lessons � Design Bid Build � Pre-Qualify Paving Contractors based on experience, financial strength (5 Qualified) � Liquidated Damages – based on Planning model delays � Nightly Runway Opening Delay - $500/ minute � Nightly Taxiway Opening Delay - $100/ minute � Phase 1 (Mobilization)- $ $75,000 /day. Termination if 10 days late � Phase 2 (Paving and Lighting) - $225,000/day � Miscellaneous Modification budget established at 2.5% ($2 million) � Addressed weather delays in contract, during pre-bid and again after award � Extended Bid process �� Requested a detailed schedule and construction method with Bid � Increased invoicing cycle from once a month to weekly invoicing � 50% of mobilization paid on first invoice

Procurement Lessons � PPre-Qualified Q lifi d Bidd Bidders � 3 of 5 Bidders submitted bids (1 didn’t submit, 2 joint ventured) � Bid Bids$67.5 $67 5 M M, $91 $91.5 5 M and d $91 $91.9M 9M � Met with low bidder to discuss their Bid submittal � Bid items discussed � Management of the project � Schedule �� Logistics planning � Traffic control plan � Resources � EEssential ti l Subcontractors S b t t � Low Bidder found non-responsive and non-responsible � Awarded to second Bidder after meeting with them � Issued Notice To Proceed 3 months after determination

Procurement Lessons<br />

� PPre-Qualified Q lifi d Bidd Bidders<br />

� 3 of 5 Bidders submitted bids (1 didn’t submit, 2 joint<br />

ventured)<br />

� Bid Bids$67.5 $67 5 M M, $91 $91.5 5 M and d $91 $91.9M 9M<br />

� Met with low bidder to discuss their Bid submittal<br />

� Bid items discussed<br />

� Management of the project<br />

� Schedule<br />

�� Logistics planning<br />

� Traffic control plan<br />

� Resources<br />

� EEssential ti l Subcontractors<br />

S b t t<br />

� Low Bidder found non-responsive and non-responsible<br />

� Awarded to second Bidder after meeting with them<br />

� Issued Notice To Proceed 3 months after determination