<strong>Hartsfield</strong>-<strong>Jackson</strong> <strong>Atlanta</strong> <strong>International</strong> <strong>Airport</strong><br />

<strong>Runway</strong> <strong>8R</strong>/<strong>26L</strong> Rehabilitation Project<br />

Presented By:<br />

Quintin Watkins and<br />

Brian Watkinson<br />

Making the Impossible Possible<br />

Through Planning and Teamwork


Presentation Outline<br />

� Project Overview<br />

� <strong>Airport</strong> Planning Lessons<br />

� Design Lessons<br />

� Procurement Lessons<br />

�� Estimating Considerations<br />

� Construction Pre-planning<br />

� Construction Execution<br />

� Keys to Success


• 5 <strong>Runway</strong> System<br />

ATL Airfield Overview<br />

• 2 Primary Arrival<br />

<strong>Runway</strong>s<br />

• 2 Primary Departure<br />

<strong>Runway</strong>s<br />

• 1 Mixed Use<br />

• Airfield Capacity<br />

– Arrivals – 126<br />

8L – 45<br />

9R – 36<br />

10 – 45<br />

– Departures – 118<br />

<strong>8R</strong> – 50<br />

9L – 38<br />

10 – 30<br />

� <strong>Runway</strong> <strong>8R</strong>/<strong>26L</strong> - 37 years old


Project Overview<br />

10,000 , FT long g x 150 FT wide<br />

� 10,000’ X 150’ Primary Departure <strong>Runway</strong><br />

� 3,000’ x 75’ East end of Taxiway E<br />

� 260,000 SY Pavement Replacement<br />

� 16”PCC /6”Cement Treated or Graded Aggregate Base<br />

� New 20” PCC on 2” Asphaltic Cement Concrete Base (ACC)<br />

�� Replaced Pavement Underdrains<br />

� Overlaid Shoulders with ACC<br />

� Replaced Lighting


Project Schedule<br />

� Project Planning Started in 2002<br />

� Construction Started September 8, 2006<br />

� Project completed on November 5, 2006<br />

� 59 ½ Days @ $85 million (ahead of schedule and<br />

$7 million below budget)


Planning Lessons<br />

� Project Timing- 60 Days<br />

� Recent Opening of <strong>Runway</strong> 10/28 in May 2006<br />

� Coordination with Taxiway V project<br />

– Excavation at end of <strong>8R</strong> end<br />

� Fall airline schedule reduction


<strong>Runway</strong> <strong>8R</strong>/<strong>26L</strong> Rehabilitation - Modeling<br />

� Modeling determined the phasing and<br />

expedited areas


Modeling – Construction Option1 Phase A


Modeling – Construction Option 1 Phase B


Modeling – Construction Option 1 Phase C


Modeling – Construction Option 2


Design Lessons<br />

� On-Call Engineering Consultant<br />

� $2.2 million contract including design and<br />

construction t ti administration<br />

d i i t ti<br />

� 7 month design completed in November 2005<br />

� Included c uded 24/7 / Co Construction st uct o Support Suppo t -1 rep ep on-site o steata at all<br />

times<br />

� Meetings held bi-monthly with DOA design<br />

support staff and impacted stakeholders<br />

� Milestones<br />

�� SD 30% with cost estimate $77 million<br />

� DD 60% Specification Submittal<br />

�� CD 100% with cost estimate $82 million


Design Lessons<br />

� Haul Road parallel to runway<br />

�� Batch Plant Site – Power and Water available<br />

� Security Plan pre-approval<br />

�� Met with Material Suppliers to understand lead<br />

times and supply shortages<br />

� Pavement section test strip<br />

� Utility Locations- If it’s critical find it before the<br />

Contractor


Procurement Lessons<br />

� Design Bid Build<br />

� Pre-Qualify Paving Contractors based on experience, financial<br />

strength (5 Qualified)<br />

� Liquidated Damages – based on Planning model delays<br />

� Nightly <strong>Runway</strong> Opening Delay - $500/ minute<br />

� Nightly Taxiway Opening Delay - $100/ minute<br />

� Phase 1 (Mobilization)- $ $75,000 /day. Termination if 10 days late<br />

� Phase 2 (Paving and Lighting) - $225,000/day<br />

� Miscellaneous Modification budget established at 2.5% ($2 million)<br />

� Addressed weather delays in contract, during pre-bid and again<br />

after award<br />

� Extended Bid process<br />

�� Requested a detailed schedule and construction method with Bid<br />

� Increased invoicing cycle from once a month to weekly invoicing<br />

� 50% of mobilization paid on first invoice


Procurement Lessons<br />

� PPre-Qualified Q lifi d Bidd Bidders<br />

� 3 of 5 Bidders submitted bids (1 didn’t submit, 2 joint<br />

ventured)<br />

� Bid Bids$67.5 $67 5 M M, $91 $91.5 5 M and d $91 $91.9M 9M<br />

� Met with low bidder to discuss their Bid submittal<br />

� Bid items discussed<br />

� Management of the project<br />

� Schedule<br />

�� Logistics planning<br />

� Traffic control plan<br />

� Resources<br />

� EEssential ti l Subcontractors<br />

S b t t<br />

� Low Bidder found non-responsive and non-responsible<br />

� Awarded to second Bidder after meeting with them<br />

� Issued Notice To Proceed 3 months after determination


Estimating Considerations<br />

� BBatch h plant l site i<br />

� Cement and Flyash Storage<br />

� Material Availability<br />

� Handling of Cement and Flyash<br />

� Concrete Temperature<br />

�� Overall Resources<br />

� People<br />

� Equipment


BATCH PLANT AREA<br />

Large Erie Plant<br />

Small Erie Plant


Large Erie Plant<br />

Plant was purchased for job at cost of $500 $500,000 000 Fun Fun Fact Fact – During the best<br />

24 24-hour hour period over 10,000<br />

tons of aggregate were<br />

received.


Small Erie Plant<br />

Fun Fact – Over 100,000<br />

tons of aggregate were<br />

stockpiled prior to the<br />

startofwork<br />

start of work.


Silos – 14 New and 4 Used<br />

Silos were purchased for the<br />

Silos were purchased for the<br />

job at a cost of $930,000.<br />

Fun Fun Fact Fact – These silos silos can hold<br />

approximately 3000 tons of cement and 1000<br />

tons of flyash. At its peak in a 24 24-hour hour period<br />

over 2500 tons (93 loads) of cement and 625<br />

tons (23 loads) of flyash were off loaded into<br />

these silos.


CEMENT TRAILERS – 15 EA<br />

Fun Fact – Each trailer is<br />

capable of transporting<br />

about 27 tons of cement.<br />

Trailers were purchased for the job<br />

p j<br />

at cost of $870,000.


CYCLONE SYSTEM<br />

Fun Fact – Cyclone system<br />

can push 10 tons of<br />

cement to the plant every<br />

40 seconds. d<br />

Cyclone Air System was<br />

Cyclone Air System was<br />

purchased for the job at a<br />

cost of $450,000.


CHILLERS – 5 Each<br />

The chillers were rented at a<br />

total cost of $90,000.<br />

Fun Fact – Each chiller is<br />

capable of cooling 250 gallons of<br />

water by 10 degrees in I minute.


Ice Makers – 6 Each<br />

Fun Fact – These ice makers<br />

Ice makers were<br />

can produce d 300 t tons of f i ice<br />

purchased for the job at a<br />

per day. That is the<br />

cost of $1,800,000.<br />

equivalent of 60,000 bags.


Paving Equipment Resources<br />

� 2 GGomaco 4000 pavers<br />

� 1 Gomaco 2800 paver<br />

� 1 GGomaco 2600 paver<br />

� 5 Concrete Placers<br />

� 3 Allen Screeds<br />

� 2 Leica wireless<br />

paving system<br />

Fun Fact – The 2800 paver<br />

was purchased for the job at a<br />

cost t of f $540,000. $540 000<br />

Two Leica wireless paving<br />

systems were purchased for<br />

th the job j b at t a cost t of f $219,000 $219 000<br />

per each.


Resources<br />

Resources<br />

•Staff 70<br />

•Craft 230<br />

•200 Legal g hauls<br />

•18 Subcontractors – 250 to 300 craft


Pre-construction Planning Lessons<br />

� EExecutive i Level L l Meetings M i<br />

� 45-day out<br />

�� 30 30-day day out<br />

� 15-day out<br />

� Site SteInvestigation estgato<br />

� What-if Plans<br />

� Test Strips


Executive Level Meetings<br />

•45-day out<br />

•30-day out<br />

•15-day out


What-if Plans<br />

• Anticipate variable and poor soil<br />

conditions


Pre-construction Site Investigation


Pre-construction Site Investigation


Test Strip - Low Slump Concrete


Test Strip - Low Slump Concrete


Test Strip - Hand Pours


Test Strip - Slip Paving


Test Strip - Slip Paving Off of a Header


Test Strip - Electrical


TEST STRIP - Testing


TEST STRIP – Finished Product<br />

Fun Fact – Final cost<br />

of test strip was over<br />

$250,000. ,


DEMOLITION - 29,990 SLABS 6.25’X12.50’<br />

Fun Fun Fact Fact – During the best 24 24-hour hour<br />

period some 4,000 slabs were<br />

removed.


Slab Dumpsite – 14 AC


Fun Facts<br />

� The slabs removed on the job will weigh almost<br />

esabs e o edo t ejob eg a ost<br />

249,000 tons – this equals the weight of 585 fully<br />

loaded Boeing 747’s


Fun Facts<br />

�� The slabs removed on the<br />

job will reach 8.03 miles<br />

high if stacked on top of<br />

one another th (7000’ above b<br />

most airplane cruising<br />

altitudes)<br />

� This equals covering a<br />

football field to a height of<br />

6 stories<br />

t i


ROTOMILL - 261,000 SY


SUBGRADE PREPARATION - 67,800 SY<br />

Over 10,000 CY of low slump<br />

concrete t was required.<br />

i d


UNDERDRAIN - 74,000 LF OF 6”-8” PERF. PIPE<br />

13,400 LF NON PERF. PIPE<br />

Fun Fact – During the best 24-hour 24 hour<br />

period about 6,000 LF of underdrain<br />

was installed installed.


ASPHALT PAVING - 70,300 TONS<br />

Fun Fact – During the best<br />

24 24-hour hour period over 6,000 tons<br />

of asphalt p was p<br />

placed.


Concrete Paving<br />

Fun Fact – During the best<br />

24 24-hour hour period over 10,000 cy<br />

of concrete was placed or an<br />

average of 416 cy/hr cy/hr.


The Job<br />

Progress g


Day 7


Day 14


Day 27


Day 39


Day 54


Opening Day – Day 59 1/2


Final Fun Facts<br />

We Made It!<br />

� At our peak we did $12.5<br />

million of work in a week.<br />

� Th That t is i the th equivalent i l t of f<br />

doing $650 million / year!<br />

�� At peak peak we worked over<br />

18,000 man-hours.<br />

� That is the equivalent q of 450<br />

people based on a 40 hour<br />

work week or 936,000 man-<br />

hours / year!<br />

� Over the 42 days of concrete<br />

paving p g we averaged g 3,650 , cy y<br />

every day or 160 cy every<br />

hour.


Keys to Success<br />

� Complete Team Effort<br />

� Phasing (Aircraft Movement Simulation)<br />

� Detailed Planning (<strong>Airport</strong> & Contractor)<br />

� Pre-construction Investigation / Test Strips<br />

� Resources<br />

� Quick Issue Resolution<br />

� 24/7 Engineer Support<br />

� Consistent Mix Design g<br />

� Wireless Paving<br />

� Maturity y<br />

Meters


Team Celebration


THANK YOU!<br />