12.07.2015 Views

m|ksx funs'kky - Doiuk.org

m|ksx funs'kky - Doiuk.org

m|ksx funs'kky - Doiuk.org

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

in KW and phasing of powerrequirement. (Total power shallbe made available by 2004,through construction and smallloads are readily available).2.6 Water requirement in Litres perday2.7 Proposed investment in Plantand Machinery2.8.1 Proposed Investment in Buildingconstruction2.8.2 Proposed investment in SiteDevelopment2.9 Total Investment to be made(Except Land)2.10 Proposed employment(a) Managerial(b) Supervisor(c) Skilled(d) Un-skilled(e) Contract/Out sourchingTotal2.11 Estimated movement of rawmaterial and Finished Products(Avg. per month)Quantity per month (RawMaterial + Finished Goods) :No. of Trucks per month (RawMaterial + Finished Goods) :2.11 Financial arrangement proposedto be made3 Details about effluents:3.1 Quantity of liquid effluent litresper day.Please mention the compositionof the liquid effluent.3.2 Solid wastes generated(Kilograms per day)3.3 Whether gaseous effluent shallbe released ? If yes, Mention themajor gaseous effluents withquantity per day in suitableunits.3.4 Disposal System proposed4 FOR NEW INDUSTRIAL PLOT/FUTURE EXPANSION.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!