12.07.2015 Views

Nokia Standard Document Template - Environmental Protection of ...

Nokia Standard Document Template - Environmental Protection of ...

Nokia Standard Document Template - Environmental Protection of ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4th Mission Report _KE3_Jan –Feb 2013GeologyGeorgia 16-Feb-13Tbilisi: cameral work on Water Body identification and delineation with the beneficiaries: NEA Dept. <strong>of</strong> Monitoring, Hydromel, Eng.GeologyTravel day 17-Feb-13 The team (DTL, KE3, KE4, KE5) travel from to Baku by plane at 20:15; overnight stay in BakuAzerbaijan 18-Feb-13Baku: cameral work on Water Body identification and delineation with the beneficiaries: Monitoring Dept., Hydromel, Hydro-Geology ExpeditionAzerbaijan 19-Feb-13Baku: cameral work on Water Body identification and delineation with the beneficiaries: Monitoring Dept., Hydromel, Hydro-Geology ExpeditionAzerbaijan 20-Feb-13Baku: cameral work on Water Body identification and delineation with the beneficiaries: Monitoring Dept., Hydromel, Hydro-Geology ExpeditionAzerbaijan 21-Feb-13Baku/Travel: DTL leaves Baku at 12:30; KE4 - at 09:35; KE5 - at 16:10; KE3 works on Act 1.5/1.6) with the Env. Lab <strong>of</strong> the MoEMonitoring DepartmentAzerbaijan 22-Feb-13 Baku: KE3 works on Act 1.5/1.6) with the Env. Lab <strong>of</strong> the MoE Monitoring DepartmentTravel day 23-Feb-13 Baku/Travel: KE3 works on QA/QC mission report; KE3 leaves Baku at 20:30 (Baku-Doha-Kuala Lumpur-Penang)Page 24 <strong>of</strong> 36

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!