12.07.2015 Views

ERA guide for application of the Common Safety Methods ... - Europa

ERA guide for application of the Common Safety Methods ... - Europa

ERA guide for application of the Common Safety Methods ... - Europa

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

European Railway AgencyGuide <strong>for</strong> <strong>the</strong> <strong>application</strong> <strong>of</strong> <strong>the</strong> CSM Regulation undertakings' and infrastructure managers' safety management system. Section 1.1.1 inAnnex I provides <strong>the</strong> overall risk management framework which is covered by <strong>the</strong> CSMRegulation. The CSM Regulation also sets out a harmonised decision process <strong>for</strong> assessing<strong>the</strong> significance <strong>of</strong> changes: see Article 4.[G 2] By virtue <strong>of</strong> Article 2 (1), <strong>the</strong> risk management and risk assessment processes <strong>of</strong> <strong>the</strong> CSMcover safety risks related to technical, operational and organisational changes <strong>of</strong> railwaysystems. They do not deal with o<strong>the</strong>r project risks such as <strong>for</strong> example <strong>the</strong> management <strong>of</strong>financial risks or <strong>of</strong> risks to miss project deadlines.Article 2. ScopeArticle 2 (1)The CSM on risk evaluation and assessment shall apply to any change <strong>of</strong> <strong>the</strong> railway system ina Member State, as referred to in point (2) (d) <strong>of</strong> Annex III to Directive 2004/49/EC, which isconsidered to be significant within <strong>the</strong> meaning <strong>of</strong> Article 4 <strong>of</strong> this Regulation. Those changesmay be <strong>of</strong> a technical, operational or organisational nature. As regards organisational changes,only those changes which could impact <strong>the</strong> operating conditions shall be considered.[G 1] The CSM helps <strong>the</strong> actors to meet <strong>the</strong> requirements in Annex III(2)(d) <strong>of</strong> <strong>the</strong> Railway <strong>Safety</strong>Directive {Ref. 1} related to <strong>the</strong> RU and IM safety management system. The relevant assessmentcriteria produced by <strong>the</strong> <strong>Safety</strong> Cert team <strong>of</strong> <strong>ERA</strong> <strong>for</strong> railway undertakings and infrastructuremanagers related to <strong>the</strong>se requirements are set out below (extracted from {Ref. 4}):ABSTRACT/DESCRIPTIONd.0 Railway organisations must have a system in place to control changes/new projects andmanage related risks, taking into account also those relating to occupational safety (2) .Changes can apply totechnique/technologies;operational procedures/rules/standards;organisational structure.The SMS needs to ensure that <strong>the</strong> CSMs on risk assessment, developed according to Article6(3)(a) <strong>Safety</strong> Directive, are applied where appropriate.ASSESSMENT CRITERIAd.1 The RU/IM has processes and criteria in place to recognise changes in equipment,procedures, organisation, staffing or interfaces.d.2 The RU/IM has processes to assess <strong>the</strong> level <strong>of</strong> impact <strong>of</strong> changes to decide whe<strong>the</strong>r toapply <strong>the</strong> CSMs on risk assessment.d.3 The RU/IM has processes to ensure risk assessment and identification <strong>of</strong> controlmeasures.d.4 The RU/IM has processes to monitor <strong>the</strong> implementation and effectiveness <strong>of</strong> controlmeasures.d.5 There are processes/measures in place to assess with o<strong>the</strong>r organisations (IM, o<strong>the</strong>r RUs,third parties, etc) interface risks introduced by changes.d.6 The results <strong>of</strong> <strong>the</strong> risk analysis are visible to all relevant staff and <strong>the</strong>re are processes inplace to feed <strong>the</strong>se results into o<strong>the</strong>r processes within <strong>the</strong> organisation.(2 ) Ref.: Directive 2004/49/EC, Recital (14) Reference: <strong>ERA</strong>/GUI/01-2008/SAF Version: 1.1 Page 10 <strong>of</strong> 54File Name: Guide_<strong>for</strong>_Application_<strong>of</strong>_CSM_V1.1.docEuropean Railway Agency ● Boulevard Harpignies, 160 ● BP 20392 ● F-59307 Valenciennes Cedex ● France ● Tel. +33 (0)3 27 09 65 00 ● Fax +33 (0)3 27 33 40 65 ● http://www.era.europa.eu

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!