12.07.2015 Views

appraisal drilling of geothermal wells in olkaria domes - Orkustofnun

appraisal drilling of geothermal wells in olkaria domes - Orkustofnun

appraisal drilling of geothermal wells in olkaria domes - Orkustofnun

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Report 13 303 Ogola6. ENVIRONMENTAL MONITORING PLANDue to the small magnitude <strong>of</strong> the project and its m<strong>in</strong>imal implications on the socioeconomic status <strong>of</strong>the area, most socioeconomic variables like population, labour force demand, education, services and<strong>in</strong>frastructure will be monitored. KenGen expects to be ISO 9001:2000 certified by December 2004.All ISO requirements <strong>in</strong> regard to quality management will be effected. Procedures on environmentalmonitor<strong>in</strong>g have been developed. An environmental monitor<strong>in</strong>g plan <strong>in</strong>cludes the follow<strong>in</strong>g:Pre-project monitor<strong>in</strong>g: Stakeholder consultations and disclosure. Ambient air quality monitor<strong>in</strong>g,wildlife movements and soil erosion monitor<strong>in</strong>g is on-go<strong>in</strong>g <strong>in</strong> the entire Greater Olkaria <strong>geothermal</strong>field and <strong>in</strong> the Olkaria Domes.Project implementation monitor<strong>in</strong>g: Monitor<strong>in</strong>g <strong>of</strong> environmental variables dur<strong>in</strong>g <strong>drill<strong>in</strong>g</strong> and test<strong>in</strong>gto determ<strong>in</strong>e changes which may have occurred as a result <strong>of</strong> the project. These will <strong>in</strong>clude trafficmovement, community compla<strong>in</strong>s, soil erosion and management strategies, labour force requirements,accident cases, impact on wildlife resources, water use, solid and liquid waste management, and airquality.Post project monitor<strong>in</strong>g: This will <strong>in</strong>volve cont<strong>in</strong>uous monitor<strong>in</strong>g and measurements to ensure that therequired legal requirements and standards are met and strictly adhered to. Environmental audits willbe carried out as part <strong>of</strong> the KenGen rout<strong>in</strong>e audits <strong>in</strong> accordance to the National EnvironmentalManagement Authority Regulations and will be submitted to the authorities for scrut<strong>in</strong>y.7. CONCLUSIONS AND RECOMMENDATIONS7.1 ConclusionsGeothermal projects do not cause adverse socioeconomic negative impacts. Therefore the OlkariaDomes (IV) <strong>drill<strong>in</strong>g</strong> project will not cause any long term negative impacts. KenGen, through Olkaria Iand II, has adequately met the key socioeconomic responsibilities and any benefits from the currentproject will be an added bonus to the region. A full EIA will be conducted upon completion <strong>of</strong>production <strong>drill<strong>in</strong>g</strong> <strong>in</strong> preparation for the steam field development and power plant construction.The study area has undergone tremendous social and economic revolution <strong>in</strong> the last two decades.The rate <strong>of</strong> economic development does not match the land and natural resource carry<strong>in</strong>g capacity northe rate <strong>of</strong> <strong>in</strong>frastructural development. The lake water is the most critical attraction for economicactivities. Fish<strong>in</strong>g has been exploited beyond susta<strong>in</strong>able means; population has <strong>in</strong>creased beyond<strong>in</strong>frastructural development and services; and agricultural expansion has gone beyond land capacity.Stakeholders have formed associations to manage and conserve the resources <strong>in</strong> the area and have amutual coexistence/relationship with each other. The success <strong>of</strong> these associations will obviouslydepend on the determ<strong>in</strong>ation <strong>of</strong> the stakeholders to conserve and save the area. Most <strong>of</strong> the <strong>in</strong>habitantsare not <strong>in</strong>digenous. Susta<strong>in</strong>able development <strong>of</strong> the area should be re<strong>in</strong>forced by all stakeholders andwell-wishers. Mutual coexistence should be based on moral pr<strong>in</strong>ciples, values and environmentalethics. The stakeholders should not just be recipients <strong>of</strong> the project benefits but should also beaccountable and accommodate <strong>in</strong>terests and needs <strong>of</strong> each other <strong>in</strong>clud<strong>in</strong>g the project proponent’s <strong>in</strong>this case KenGen. The degree <strong>of</strong> <strong>in</strong>volvement and responsibility <strong>of</strong> each and every stakeholder shouldbe very clear, not mere rhetoric. Benefits accrued should be obvious and <strong>of</strong> value to the region orrecipients. The government should also <strong>in</strong>tervene to ensure susta<strong>in</strong>able use <strong>of</strong> resources.Further recommendations are discussed below.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!