Dec. /10 - VETTER Krantechnik
Dec. /10 - VETTER Krantechnik
Dec. /10 - VETTER Krantechnik
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
“MediaTower”. As a pipe fabricator with outstanding<br />
technical capabilities, <strong>VETTER</strong> is<br />
able to manufacture the steel structures for<br />
advertising towers cost-effectively and in<br />
all sizes. The MediaTower team assists you<br />
from drawing up the concept and the static<br />
calculation right through to installing the steel<br />
structure.<br />
jens.utsch@vetter.eu<br />
All the team at <strong>VETTER</strong> would like to congratulate<br />
Sebastian Vettel on winning the 20<strong>10</strong> World Championship.<br />
At 23 years of age, the driver from Heppenheim is<br />
the youngest Formula 1 World Champion of all time.<br />
The display tower’s<br />
steel structure.<br />
Hockenheim circuit<br />
MEDIATOWER<br />
l located in: Hockenheim, a town south<br />
of Mannheim in the State of<br />
Baden-Württemberg in Germany<br />
l length of circuit: 4,574 km<br />
l Bends: 17<br />
l Spectator capacity: approx. 120,000<br />
www.hockenheimring.de<br />
Scope of work supplied for Mediatower:<br />
l Verifiable or verified structural<br />
analyses for all sites<br />
l Foundation plans and various<br />
anchoring systems<br />
l Fixing frame tailored to the size and<br />
shape of the display surfaces<br />
l Safe pre-assembly of display surfaces<br />
at ground level<br />
l Joint coordinated assembly of all<br />
elements or a precise drawing for<br />
self-assembly<br />
www.mediatower.biz<br />
<strong>Dec</strong>ember 20<strong>10</strong> Lift it 7