12.07.2015 Views

Report - PEER - University of California, Berkeley

Report - PEER - University of California, Berkeley

Report - PEER - University of California, Berkeley

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 5. How can we differentiate the demand <strong>of</strong> repair period between “withina week” and “within 3 weeks” in design ?How can we take difference <strong>of</strong> the repair period <strong>of</strong> “within a week” and“within 3 weeks” into account in design ?Number andpercentage(1) Design by differentiating ductility factor 15 (15%)(2) Design by differentiating flexural strength 3 (3%)(3) Design by differentiating residual drift after an earthquake 22 (22%)(4) Design by differentiating the lateral force 3 (3%)(5) It is unable to differentiate the two demands based on the current54 (54%)technology(6) Others 3 (3%)(7) No answer 0Total 100 (100%)Table 6. How much more initial cost is required to construct“damage free bridges”?How much times investment than the current level is required to construct“damage-free bridges”?Number andpercentage(1) 10% more cost 4 (4%)(2) 30% more cost 32 (32%)(3) 50% more cost 25 (25%)(4) 100% more cost 20 (20%)(5) 200% more cost 5 (5%)(6) Others 10 (10%)(7) No answer 4 (4%)Total 100 (100%)Table 7. How repair cost should be in comparison withinitial investment?How should the repair const be in comparison with the initial investment? Number andpercentage(1) Repair is not necessarily requested 12 (12%)(2) Within 10% 11 (11%)(3) Within 20% 23 (23%)(4) Within 30% 30 (30%)(5) Within 40% 19 (19%)(6) Within 50% or over 1 (1%)(7) No answer 4 (4%)Total 100 (100%)84

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!