12.07.2015 Views

Juan Diaz WWTP Construction and Operations and Maintenance ...

Juan Diaz WWTP Construction and Operations and Maintenance ...

Juan Diaz WWTP Construction and Operations and Maintenance ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 8 - <strong>Juan</strong> <strong>Diaz</strong> <strong>WWTP</strong> <strong>Construction</strong> <strong>and</strong><strong>Operations</strong> <strong>and</strong> <strong>Maintenance</strong>Costs8.1 Projected <strong>Construction</strong> CostThe proposed treatment process for the <strong>Juan</strong> <strong>Diaz</strong> <strong>WWTP</strong> is the step-feed modification of the airactivated sludge process. Provisions for alum addition will be made to ensure compliance witheffluent phosphorus limits. This will allow for the required nutrient removal. The construction costestimate for the <strong>Juan</strong> <strong>Diaz</strong> <strong>WWTP</strong> is $150,000,000 as outlined in Table 8-1.Table 8-1<strong>Juan</strong> <strong>Diaz</strong> Wastewater Treatment Plant<strong>Construction</strong> Cost Estimate1 Site Work $4,500,0002 Paving $1,150,0003 Headworks <strong>and</strong> Administration $8,870,0004 Aeration Basin $25,780,0005 Blower Building $4,960,0006 Secondary Clarifiers $23,910,0007 RAS/WAS Pump Station $5,410,0008 Chlorine Facility $2,040,0009 Aeration Basin Distribution Box $810,00010 Clarifier Distribution Box $2,860,00011 Yard piping $9,440,00012 Anaerobic Digesters $18,610,00013 Solids H<strong>and</strong>ling Building $5,530,00014 Electrical & St<strong>and</strong>by Generator $4,330,00015 <strong>Maintenance</strong> Building $800,00016 Sludge L<strong>and</strong>fill $6,000,000SUBTOTAL $125,000,00020% Contractor Overhead & Profit $25,000,000CONSTRUCTION COST $150,000,0008.2 Organization <strong>and</strong> StaffingThe <strong>Operations</strong> of the <strong>Juan</strong> <strong>Diaz</strong> <strong>WWTP</strong> will be organized in three different groups.• <strong>Maintenance</strong> Group – Responsible for both repair <strong>and</strong> preventive maintenanceprograms.• Production Group – Responsible for the efficient operation of the treatment plant,sludge hauling, <strong>and</strong> the operation of the sludge l<strong>and</strong>fill.Hwd:40521R808.doc 8-1 Panamá CityFinal TechnicalAssistance Report


8.0 <strong>Juan</strong> <strong>Diaz</strong> <strong>WWTP</strong> <strong>Construction</strong> <strong>and</strong> <strong>Operations</strong> <strong>and</strong> <strong>Maintenance</strong> Costs• General Services – Responsible for the administration <strong>and</strong> logistics of the operation.A total staff of about 100 persons for round-the-clock operations, maintenance <strong>and</strong> administrationwork at the <strong>Juan</strong> <strong>Diaz</strong> <strong>WWTP</strong> <strong>and</strong> solid waste disposal operation is expected. For the first year ortwo, this total may be approximately 30 to 50 percent larger because of training <strong>and</strong> start-upprocedures, including equipment manufacturer’s technicians troubleshooting in the field.A total staff of 81 personnel are identified for operating the <strong>Juan</strong> <strong>Diaz</strong> primary treatment plant.Table 8-2<strong>Juan</strong> <strong>Diaz</strong> <strong>WWTP</strong> O&M StaffingActivityPhase IPrimary TreatmentAdministrationPlant Director 1Plant Assistant Director 1Plant Administrator 1Secretarial Pool 3Drivers 2Messengers 2HousekeepingSubcontractGardeningSubcontractRestaurantSubcontract<strong>Operations</strong>Process Supervisor 1Heads of Shifts 5Wastewater Treatment Operators 5Assistants in Wastewater Treatment 15Sludge Treatment Operators 5Assistants in Sludge Treatment 15Laboratory Technician 2Laboratory Operators 2Head of <strong>Maintenance</strong> 1Head Mechanic 1Mechanics 4Assistants to Mechanics 4Head Electrician 1Electricians 4Assistants to Electricians 4Instrumentation Specialists 2Total 81Hwd:40521R808.doc 8-2 Panamá CityFinal TechnicalAssistance Report


8.0 <strong>Juan</strong> <strong>Diaz</strong> <strong>WWTP</strong> <strong>Construction</strong> <strong>and</strong> <strong>Operations</strong> <strong>and</strong> <strong>Maintenance</strong> CostsPersonnel for sludge transport to final disposal site, <strong>and</strong> personnel to operate final disposal site arenot included in the above estimate.8.3 Projected Operating CostThe annual operating costs for the proposed 102 mgd wastewater treatment plant with interiml<strong>and</strong>fill operations are summarized below.Table 8-3Annual Operational <strong>and</strong> <strong>Maintenance</strong> CostCost ItemAnnual CostManpower $1,000,000Power 4,300,000Chemical 750,000Waste Transport & Disposal 2,000,000<strong>Maintenance</strong> 500,000Total $US 8,550,000Hwd:40521R808.doc 8-3 Panamá CityFinal TechnicalAssistance Report

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!