12.07.2015 Views

OPERATIONS & MAINTENANCE MANUAL - McCormick PCS Info

OPERATIONS & MAINTENANCE MANUAL - McCormick PCS Info

OPERATIONS & MAINTENANCE MANUAL - McCormick PCS Info

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>MAINTENANCE</strong> MANAGEMENT<strong>OPERATIONS</strong> & <strong>MAINTENANCE</strong> <strong>MANUAL</strong>C • 5/Page 4 of 4No. C • 5Tenant Construction ProceduresContractor is to do a thorough inspection of all common areas prior to construction todocument any existing building deficiencies. Upon completion of work, contractor shallreturn these areas to the same condition in which they were originally viewed. Anydamages caused by the contractor shall be corrected at the sole cost of the contractor.14. SignageContractor or subcontractor signage may not be displayed in the building common areas orany of the window glass.15. ParkingThe loading dock will be used for loading and unloading. All contractors can makearrangements with the garage operator for daily parking. Any parking in rear of the buildingthat is not authorized by the Manager will be subject to ticketing and towing.© 1992 - 1997, Michael Robert <strong>McCormick</strong>All Rights Reserved

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!