OPERATIONS & MAINTENANCE MANUAL - McCormick PCS Info
OPERATIONS & MAINTENANCE MANUAL - McCormick PCS Info OPERATIONS & MAINTENANCE MANUAL - McCormick PCS Info
MAINTENANCE MANAGEMENTOPERATIONS & MAINTENANCE MANUALC • 2/Page 3 of 8No. C • 2Overtime HVACThis calculation has been structured to assure fair and equitable billing of overtime HVAC in thoseinstance where numerous tenants request overtime HVAC. On the following work sheets enteryour cost values only in the “green cells,” or unprotected cells where information values arerequired.The following data will be required to conduct the OTAC calculations:1. Project Name 15. Cooling Tower Run-time2. Chiller Unit 16. O.A. & T.E. Fan Amperage3. Chiller Tonnage Capacity 17. Air Compressor Amperage4. Chiller Design KW per Ton 18. Air Compressor Run-time5. Min. Load # AHUs & VAV Boxes 19. Equipment Cost for Plant6. Average Amperage per AHU 20. Equipment Estimated Life7. Building Average Voltage 21. Annual Run-time8. Average Cost per KW 22. Maintenance Cost:9. # Condenser Pumps a. Air filters10. Total Condenser GPM Rate b. Water treatment11. Cycles of Concentration c. HVAC Supplies12. Chill water pump Amperage d. Misc. Supplies13. Condenser pump Amperage e. Man-power14. Cooling Tower Amperage 23. Water & Sewage Cost© 1992 - 1997, Michael Robert McCormickAll Rights Reserved
MAINTENANCE MANAGEMENTOPERATIONS & MAINTENANCE MANUALC • 2/Page 4 of 8No. C • 2Overtime HVACCalculation ExampleStep One -- Electrical CostsA. Water Chilling Unit(1) Condition #1 -- Minimum Load (4 AHUs):Design KW per Ton x minimum load = Total Ch.71 x 30% of 300 Tons = Total Chiller KW at condition #1.71 x 90 = 63.90 KW(2) Condition #2 -- Other Load (5 AHUs):Design KW per Ton x load = Total Chiller KW at condition #2.71 x (min. load in tons : number of AHUs run at min. load)x 5 = Total Chiller KW at condition #2.71 x (90 : 4) x 5 = 79.9 KW at condition #2(3) Condition #3 -- Other Load (6 AHUs):Design KW per Ton x load = Total Chiller KW at condition #3.71 x (min. load in tons: number of AHUs run at min. load)x 6 = Total Chiller KW at condition #3.71 x (90 : 4) x 6 = 95.85% KW at condition #3NOTE: Carry out the calculation to the extent necessary.© 1992 - 1997, Michael Robert McCormickAll Rights Reserved
- Page 6 and 7: C • 1/Page 6 of 11OPERATIONS & MA
- Page 8 and 9: C • 1/Page 8 of 11OPERATIONS & MA
- Page 10 and 11: C • 1/Page 10 of 11OPERATIONS & M
- Page 12 and 13: MAINTENANCE MANAGEMENTOPERATIONS &
- Page 16 and 17: MAINTENANCE MANAGEMENTOPERATIONS &
- Page 18 and 19: MAINTENANCE MANAGEMENTOPERATIONS &
- Page 20 and 21: MAINTENANCE MANAGEMENTOPERATIONS &
- Page 22: MAINTENANCE MANAGEMENTOPERATIONS &
- Page 26 and 27: MAINTENANCE MANAGEMENTOPERATIONS &
- Page 28 and 29: MAINTENANCE MANAGEMENTOPERATIONS &
- Page 30 and 31: MAINTENANCE MANAGEMENTOPERATIONS &
- Page 32 and 33: MAINTENANCE MANAGEMENTOPERATIONS &
- Page 34 and 35: MAINTENANCE MANAGEMENTOPERATIONS &
<strong>MAINTENANCE</strong> MANAGEMENT<strong>OPERATIONS</strong> & <strong>MAINTENANCE</strong> <strong>MANUAL</strong>C • 2/Page 3 of 8No. C • 2Overtime HVACThis calculation has been structured to assure fair and equitable billing of overtime HVAC in thoseinstance where numerous tenants request overtime HVAC. On the following work sheets enteryour cost values only in the “green cells,” or unprotected cells where information values arerequired.The following data will be required to conduct the OTAC calculations:1. Project Name 15. Cooling Tower Run-time2. Chiller Unit 16. O.A. & T.E. Fan Amperage3. Chiller Tonnage Capacity 17. Air Compressor Amperage4. Chiller Design KW per Ton 18. Air Compressor Run-time5. Min. Load # AHUs & VAV Boxes 19. Equipment Cost for Plant6. Average Amperage per AHU 20. Equipment Estimated Life7. Building Average Voltage 21. Annual Run-time8. Average Cost per KW 22. Maintenance Cost:9. # Condenser Pumps a. Air filters10. Total Condenser GPM Rate b. Water treatment11. Cycles of Concentration c. HVAC Supplies12. Chill water pump Amperage d. Misc. Supplies13. Condenser pump Amperage e. Man-power14. Cooling Tower Amperage 23. Water & Sewage Cost© 1992 - 1997, Michael Robert <strong>McCormick</strong>All Rights Reserved