12.07.2015 Views

OPERATIONS & MAINTENANCE MANUAL - McCormick PCS Info

OPERATIONS & MAINTENANCE MANUAL - McCormick PCS Info

OPERATIONS & MAINTENANCE MANUAL - McCormick PCS Info

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

C • 1/Page 10 of 11<strong>OPERATIONS</strong> & <strong>MAINTENANCE</strong> <strong>MANUAL</strong>Operating StandardsNo. C • 1Start-UpWEEKLY:C. Help with work tickets as necessary.A. Check all air handlers for proper operation.B. Check sump pumps every Saturday.Schedule: 1200-20001200-13001300-180017001800-2000DAILY ROUTINE WORK PROCEDURESSHUT DOWN ENGINEERA. Dressed in uniform and report to the Assistant Engineering Supervisor forinstructions.B. Make rounds of Chiller Plant and take readings.C. Check the cooling tower for proper and continued operation.D. Check Building B HVAC system, take readings and make adjustments totemperature and static pressure as necessary.E. Check with Property Management Secretary (Building B) for any work tickets.F. Conduct water treatment on Friday.A. Proceed with work tickets or preventive maintenance assignments.A. Check with Property Management (Building B) for any work tickets.A. Check fire alarm panels at Building B and log in.B. Set Building B temperature set point up to 57 in Spring/Fall, 51 in Summer and 68in Winter, or as needed.C. Set Building B main conference room thermostat at 75.© 1992 - 1997, Michael Robert <strong>McCormick</strong>All Rights Reserved

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!