12.07.2015 Views

DKG-705 AUTOMATIC MAINS FAILURE AND REMOTE START ...

DKG-705 AUTOMATIC MAINS FAILURE AND REMOTE START ...

DKG-705 AUTOMATIC MAINS FAILURE AND REMOTE START ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DATAKOM<strong>DKG</strong>-<strong>705</strong> User’s Manual7. LOAD TRANSFER MODESversa.The <strong>DKG</strong>-<strong>705</strong> has more than one ways of transferring the load from genset to mains and viceThese modes are:-transfer with interruption,-no break transfer, (with or without synchronization)-soft transfer.7.1 Transfer with InterruptionThis is the most conventional way of transferring the load between the genset and mains. Therewill be a power interruption period duration during the transfer. Note that the program parameters P_508and P_509 define the power interruption period.If this transfer method is used, it is advised to make an electrical interlockbetween the two contactors to prevent a phase to phase short circuit.Transfer from genset to mains:-The generator contactor releases,-The unit waits for Mains Contactor Timer (P_508)-The mains contactor is energized.Transfer from mains to genset:-The mains contactor releases,-The unit waits for Generator Contactor Timer (P_509)-The generator contactor is energized.<strong>705</strong>-UE.doc - 22 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!