Paul Murchison, Project Engineer, Transportation Engineering ...
Paul Murchison, Project Engineer, Transportation Engineering ...
Paul Murchison, Project Engineer, Transportation Engineering ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
BCIInfrastructure Maintenance IssuesCLASS 3 BST PERFORMANCE8580757065600 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16AGE (Years)Class 3 - No Permafrost Class 3 - Permafrost TriggerTrend - All Other Class 3Trend - Class 3 Permafrost• Additional maintenance / rehabilitation cost in the permafrostsection is up to $22,000 / km / year• Maintenance / rehabilitation costs in permafrost sections areapproximately 8 times as much as non-permafrost sections