Seminar <strong>on</strong> “Organisati<strong>on</strong>al Restructuring of SEBs” D.V. Ramana<br />

The channels of orders with in Cesco can be called the System-3. It can collect any informati<strong>on</strong><br />

from any of the System-1 and feed the top management or collect informati<strong>on</strong> from the top<br />

management and feed the System-1s. It helps in interpreting the policy decisi<strong>on</strong>s of the higher<br />

management and also carries out audit. The str<strong>on</strong>g internal audit functi<strong>on</strong> of the organisati<strong>on</strong> can<br />

be treated as the System-3. Most of the distributi<strong>on</strong> companies (including Cesco) meticulously<br />

undertake the statutory audits and but fail to do justice to the internal audit. In the process, the<br />

very purpose of the internal audit is lost. So it is necessary to bring the audit functi<strong>on</strong> under the<br />

System-3. An effective System-2 and 3 will ensure internal stability and take care of most of the<br />

operating and day-to-day problems.<br />

However, to keep the Cesco viable and effective in the future, it is necessary to have str<strong>on</strong>g<br />

System-4. It develops capability to determine potential risks and potential benefits. A separate<br />

team from various functi<strong>on</strong>al areas or a separate department designated as “Brain” of company<br />

can be asked to look after the activities of System-4. This group or the department identifies<br />

needs and potential for changes and informs System-3. The selected course of acti<strong>on</strong> can then be<br />

implemented by System 1 and System- 2 under the supervisi<strong>on</strong> of System-3. For example, the<br />

System-III of Cesco can address the following managerial issues in the near future :<br />

� What will be the impact of Availability Tariff <strong>on</strong> its bottom line?<br />

� What will be the impact of multi-year tariff?<br />

� Should it buy power from Gridco or from the generators directly?<br />

� Is it necessary to undertake financial restructuring plan?<br />

To understand the above changes and make the people capable of handling them, System-4 can<br />

initiate training programmes and create awareness.<br />

System-5 completes the whole <str<strong>on</strong>g>model</str<strong>on</strong>g>. It is the advisory board of Cesco. This body balances the<br />

current activities against the future needs. Unlike the present system, wherein the board takes<br />

every decisi<strong>on</strong>, the System-5 acts as the judge whenever there is c<strong>on</strong>flict and makes policies <strong>on</strong><br />

the basis of the feedback from System-3 and System-4.<br />

Cesco as a viable system<br />

will have the following<br />

systems: • System 1: 15 divisi<strong>on</strong>s<br />

• System 2: Set of rules<br />

and procedures to<br />

maintain the flow of<br />

informati<strong>on</strong><br />

between<br />

divisi<strong>on</strong>s.<br />

• System3: Coordinati<strong>on</strong><br />

cell at the<br />

corporate<br />

office<br />

• System 4: The<br />

intelligence<br />

wing i.e. the<br />

Brain<br />

• System 5: The advisory<br />

board.<br />

E<br />

N<br />

V<br />

I<br />

R<br />

O<br />

N<br />

M<br />

E<br />

N<br />

T<br />

Cesco as <strong>Viable</strong> System<br />

It is important to note that VSM lays stress <strong>on</strong> the aut<strong>on</strong>omy of System-1s (i.e. <strong>on</strong> divisi<strong>on</strong>s and<br />

sub-divisi<strong>on</strong>s). They are required to be viable in their own right taking into c<strong>on</strong>siderati<strong>on</strong> their<br />

local envir<strong>on</strong>ment. System 2 and 3 intervene to ensure overall cohesiveness. This allows the<br />

S1<br />

S1<br />

S1<br />

S1<br />

S5<br />

S4<br />

S3<br />

S2<br />

9