12.07.2015 Views

Section 7 - Peabody Energy

Section 7 - Peabody Energy

Section 7 - Peabody Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Metropolitan Coal Project – Environmental AssessmentCardno (2008) Bridges near Proposed Longwalls18-44 at Metropolitan Colliery. Reportprepared for Helensburgh Coal Pty Ltd.Carpenter, S.R. and Lodge, D.M. (1986) Effects ofsubmersed macrophytes on ecosystemprocesses. Aquatic Botany 26: 341-370.C.E. Sefton Pty Ltd (1994a) ArchaeologicalInvestigation of Metropolitan Colliery LongwallApplication 1 for Metropolitan Collieries Ltd.Report prepared for Helensburgh Coal Pty Ltd.C.E. Sefton Pty Ltd (1994b) ArchaeologicalInvestigation of E Panel for MetropolitanCollieries Ltd. Report prepared forHelensburgh Coal Pty Ltd.C.E. Sefton Pty Ltd (1996a) ArchaeologicalInvestigation of Longwalls 1-4 WestcliffColliery. Report prepared for Kembla Coaland Coke Pty Limited.C.E. Sefton Pty Ltd (1996b) ArchaeologicalInvestigation of Area 4, Appin Colliery. Reportprepared for Collieries Division, BHP AustraliaCoal.C.E. Sefton Pty Ltd (2001) ArchaeologicalInvestigation of Longwall Application 8-13Metropolitan Colliery. Report prepared forHelensburgh Coal Pty Ltd.C.E. Sefton Pty Ltd (2004) ArchaeologicalInvestigation of Future Mining ExtensionsIncluding Longwalls 13-17 and 20-22. Reportprepared for Helensburgh Coal Pty Ltd.C.E. Sefton Pty Limited (2006a) SandstoneOverhang and Subsidence: Monitoring RockArt for Effects of Mining Activities. In A. Thornand J. Brunet (eds), Preservation of rock art,pp. 55-59. Occasional AURA Publication 9,Australian Rock Art Research Association,Melbourne.C.E. Sefton Pty Limited (2006b) Monitoring ofSandstone Overhangs for the Effects ofMining Subsidence from Longwalls 8-13Metropolitan Colliery. Report to HelensburghCoal Pty Ltd.Commonwealth of Australia (1992) NationalStrategy for Ecologically SustainableDevelopment.Commonwealth of Australia (2006a)Website: www.nntt.gov.au.Commonwealth of Australia (2006b) MineRehabilitation.Commonwealth of Australia (2006c) Mine Closureand Completion.Commonwealth of Australia (2008a) GarnautClimate Change Review Draft Report June2008.Commonwealth of Australia (2008b) CarbonPollution Reduction Scheme Green Paper.Commonwealth Scientific and Industrial ResearchOrganisation (2007) Climate Change inAustralia.Website: http://www.climatechangeinaustralia.gov.auDate Retrieved: 9 July 2008.Cummins, S, Roberts, D., Church, A. and Ling, J.(1997) Invertebrate associations inmacrophyte assemblages within theHawkesbury-Nepean River, NSW. Scienceand Technology in the Management of theHawkesbury-Nepean Catchment,Geographical Society NSW 14: 36-40.Dams Safety Committee (1998) Mining inNotification Areas of Prescribed Dams.Department of Climate Change (2008a) CarbonPollution Reduction Scheme Green Paper.Department of Climate Change,Commonwealth of Australia.Department of Climate Change (2008b) Webpage.Website: http://www.climatechange.gov.au.Department of Climate Change (2008c) NationalGreenhouse Accounts Factors.Department of Commerce (2007) MetropolitanColliery Wate Savings Action Plan.Department of <strong>Energy</strong>, Utilities and Sustainability(2005) Guidelines for <strong>Energy</strong> Savings ActionPlans.Department of Environment and Climate Change(2006) Assessing Vibration: A TechnicalGuideline.7-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!