Chapter 4: Activated Sludge Modelling - IqTMA-UVa
Chapter 4: Activated Sludge Modelling - IqTMA-UVa
Chapter 4: Activated Sludge Modelling - IqTMA-UVa
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Processes for BiologicalPhosphorous Removal5 Processes most commonly used: A/O TM , A 2 /O TM , UCT, Phostrip, andModified BardenphoA) A/O TM .• It does not include nitrification (limited by short SRT)• Very simple operation• HRT anaerobic 0.5-1.5 h (higher HRT cause a secondary P released) and1-3 h in the aerobic zone• SRT 2-5 d60