Processes for BiologicalPhosphorous Removal5 Processes most commonly used: A/O TM , A 2 /O TM , UCT, Phostrip, andModified BardenphoA) A/O TM .• It does not include nitrification (limited by short SRT)• Very simple operation• HRT anaerobic 0.5-1.5 h (higher HRT cause a secondary P released) and1-3 h in the aerobic zone• SRT 2-5 d60