Processes for BiologicalPhosphorous Removal2- Anaerobic Contact Time: periods of 0.25 to 1 h are sufficient forrbCOD fermentation. Too long contact times (> 3 h) result in secondaryP release not associated to PHB accumulation3- SRT. Long SRT bring about lower P-REs due to:a)- at high SRT less PAO biomass is producedb)- at high SRT PAOs are in a more extended endogenousphase, consuming their intracellular storage products.4- Waste sludge Processing. The use of gravity thickeners for sludgeconcentration might result in a significant release of P that is recycled tothe process.5- Chemical precipitation might be needed when insufficient amounts ofrbCOD are present in the influent wastewater.58

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!