Processes for BOD Removal andNitrification8. Determine Biomass Production (P XBio). Estimated NO 3-as 80 % TKNPXBioQY( So S)fdkdQY( So S)SRT QYn( NO3)1k SRT 1k SRT 1k SRTddnd9. N balance to calculate NO 3-(Find the real NO 3-production based onthe N removed during biomass growth)10. Calculate the TOTAL VSS and TSS mass in the aeration basinP MLVSS= r gHV (Heterotrophic X) + r gNV (Nitrifying bacteria) + r dV (debris) +QX 0,I(nbVSS)P MLSS=[ r gHV (Heterotrophic X) + r gNV (Nitrifying bacteria) + r dV (debris) +QX 0,I(nbVSS)]/0.85 + Q (TSS o-VSS o)11. Select a design MLSS concentration (Typically 2500-3500 mg/L for agood settler performance) and determine the aeration volume andHRTX VSSV = (P MLVSS)SRT35